ATTACHMENT 1

 

Miles of Sidewalk Built: Total and system gaps filled by Town of Chapel Hill since 2003

ID Location Section Length (feet) Year Built Construction
Plan year
Cost Funding Source
1 S. Graham St. (E. side), Cameron Ave. to Franklin St. 575 2003 2002-2003 $20,000 CDBG
2 Seawell School Rd. (E. side), Savannah Ter. to High School Rd. 500 2003 2002-2003 $14,000 CIP
3 Fordham Blvd. (W. side) Willow Dr. to Elliot Rd. 700 2004 N/A $88,500 96 Bonds
4 Legion Rd. phase 1 (S. side) Scarlette Dr. to Martin Luther King Jr. St. 800 2004 2003-2004 $38,000 CIP
5 Legion Rd. phase 2 (S. side) Clover Rd. to Ephesus Church Rd. 600 2004 2003-2004 $30,000 CIP
6 Legion Rd. phase 3 (N. side) opposite Turnbery La. 400 2005 2004-2005 $12,000 CIP
7 Legion Rd. phase 4 (S. side) Outside Legion Post 800 2005 2004-2005 $27,000 CIP
8 W. Rosemary St. (S. Side) at Roberson St. 100 2005 2004-2005 $23,500 CDBG
9 W. Rosemary St. (S. side) at S. Graham St. 100 2005 2004-2005 $23,500 CDBG
10 Curtis Rd (W. side) Elliott Rd to Clayton Rd 400 2005 2004-2005 $13,000 03 Bonds
11 Westminster Dr. (N. side) MLK Jr. Blvd. to Banks Dr. 700 2006 2004-2005 $8,100 03 Bonds
12 Kingston Dr. (E. side) Weaver Dairy Rd to Cedar Ct. 1,200 2006 2004-2005 $14,000 03 Bonds
13 Vance St. (N. side) Ransom St. to Pittsboro St. 700 2006 2004-2005 $42,000 96 Bonds
14 Kenan St. (E. side) W. Franklin St. to Cameron Ave. 730 2006 2004-2005 $68,500 96 Bonds
15 Ransom St. (E. side)  McCauley to University Dr. 930 2006 2004-2005 $77,500 96 Bonds
16 Legion Rd. phase 5 (W. side) Corner of Ephesus Church Rd. 50 2006 2004-2005 $12,000 CIP
17 Umstead Dr. (S. side) Estes Dr. Ext. to Village Dr. 1,200 2006 2004-2005 $50,000 03 Bonds
18 McCauley St. (S. side) Pittsboro St. to Brookside Dr. 1,500 2006 2005-2006 $155,000 96 & 03 Bonds *
19 Bolinwood Dr. (E. side) from greenway to apartments 900 2006 2005-2006 $20,000 03 Bonds
20 Cameron Ave. NE and SE corners at Merritt Mill Rd. 500 2006 2005-2006 $10,000 03 Bonds
21 Longleaf Dr. (N. side) Willow Dr. to Churchill Dr. 1,300 2006 2005-2006 $33,000 03 Bonds
22 S. Estes Dr. (S. side) E. Franklin St. to Willow Dr. 1,000 2006 2004-2005 $58,000 03 Bonds
23 MLK Jr. Blvd. (W. side) at Northfields Dr. 300 2006 2004-2005 $20,401 03 Bonds**
24 Fordham Blvd. (E. side)  at S. Estes Dr. 100 2006 2004-2005 $3,000 03 Bonds**
25 Culbreth Rd. (N & S side) from Channing La. to US 15-501 1,240 2006 2004-2005 $29,500 03 Bonds**
Total   17,325 3.26 (miles) $890,501  

* $ 155,000 Total, $86,500 1996 Bonds, $68,500 2003 Bonds

** Local match funds representing minimum of 20% of the total project cost