ATTACHMENT 6

 

Preliminary List of supplementary projects for

2006-2007 SIDEWALK CONSTRUCTION PLAN MASTERLIST

Total Cost $959,000

 

Town-Maintained Streets:

Project Identification Number relates to the Sept 2006 issue of the Sidewalks Request Master List

 

36 Gomains Avenue, south side, from Craig Street to Bynum Street

Comment: Identified in the Northside Mobility Plan

 

37 Sykes Street, east side, from Gomains Avenue to Whitaker Street

Comment: Identified in the Northside Mobility Plan

 

47 Mitchell Lane, west side, from Lindsay Street to McDade/Roberson Street

Comment: Identified in the Northside Mobility Plan

 

48 Mitchell Lane, west side, from McDade/Roberson Street to Caldwell Street

Comment: Identified in the Northside Mobility Plan

 

56 McMasters Street, south side, from Church Street to Edwards Street

Comment: Identified in the Northside Mobility Plan

 

57 Caldwell Street, south side, from Church Street to N. Columbia Street

Comment: Identified in the Northside Mobility Plan

 

31 Tinkerbell Road, west side, Ephesus Church Road to Fountain Ridge Road

Comment: Identified by the Ephesus Safe Routes to School group in 2005

 

40 Pritchard Avenue and Longview Street, from Umstead Drive to N. Columbia Street

Comment: Challenging topography, but sidewalk can be constructed by narrowing the road section

 

52 East Lakeview Drive from Old Durham Chapel Hill Road to US 15/501

Comment: Currently low pedestrian usage but providing a sidewalk would provide a facility linking neighborhoods off Old Durham Chapel Hill Road to Eastowne Office Park.

 

53 Hamilton Road, east side from Cleland Drive to Flemington Road

Comment: Provides connection to existing off-road path which runs parallel to Fordham Boulevard and connects Cleland Drive with Estes Drive.  Running parallel to the Rainbow Soccer fields, we do not believe this section of the street is location is unsafe for pedestrians. However, a sidewalk would connect the Glen Lennox neighborhood to S. Estes Drive/University Mall.

Status: Included on 2004-2005 Construction Plan deferred in 2005-2006.

 

 54 Flemington Road, Hamilton Road to Hayes Road

Comment: Sidewalk would connect the Glen Lennox neighborhood to S. Estes Drive

Status: Included on 2004-2005 Construction Plan deferred in 2005-2006.

 

61 Plant Road from E. Franklin Street to Community Center

Comment: Provides alternate access for pedestrians from E. Franklin Street the to Community Center.

 

65 Sedgefield Drive from Weaver Dairy Road to Honeysuckle Road

 Comment: Provide enhanced access for pedestrians in neighborhood to transit route

 

76 Honeysuckle Road from Sedgefield Drive to North Lakeshore Drive

Comment: Provide enhanced access for pedestrians in neighborhood to transit route