ATTACHMENT 2
RESOLUTION A enhancements
Aquabella
(Applicant’s recommendations)
Completion date for speed hump.
3. Pinehurst Drive Speed Hump: That the applicant remove the existing speed hump on Pinehurst Drive and, if determined necessary by the Town Manager, construct a new speed hump, outside of the intersection curb radius of the new intersection. That the final location for the new speed hump on Pinehurst Drive shall be approved by the Town Manager.
That the applicant shall obtain
an Engineering Construction Permit, prior to beginning any work within the
public right-of-way. That the construction associated with the speed humps
shall be completed, and work within the right-of-way accepted by the Town,
prior to the issuance of a Zoning Compliance Permit Final Plat.
Path ownership and transfer date
That with the
recordation of a final plat, the applicant shall dedicate
to the Town Home Owners’ Association, a 10-foot
wide public pedestrian access easement for the path connection to the Rayfield
property. The easement and boundaries shall be reviewed and approved by the
Town Manager prior to recordation at the Orange County Register of Deeds
Office.
14. Payment-in-Lieu
for Recreation Requirements: That the applicant provide a payment-in-lieu of
providing a minimum of corresponding to approximately 14,901
square feet of recreation area for this development. The payment amount
shall be reviewed and approved by the Town Manager in accordance with the Land
Use Management Ordinance, Section 5.5.2. The recreation payment amount shall
be submitted to the Town prior to recordation of the final plat. The other
portion of the required recreation area to total 16,011 square feet shall
be provided as the land area deeded to the
Homeowners’ Association and improved for pedestrian connections.
Block additional CO’s
That if the Town Manager approves a phasing plan, no Certificates of Occupancy shall be issued for a phase until all required public improvements for that phase are complete; no Building Permits for any phase shall be issued until all public improvements required in previous phases are completed to a point adjacent to the new phase, and that a note to this effect shall be placed on the final plat.
Amendments to enable maximum Stormwater treatment in ROW.
28.
Stormwater Facility NOT BE Prohibited in the Public Right-of-Way:
That all detention/retention basins, stormwater facilities and associated
infrastructure be located outside of existing or proposed right-of-way. That
stormwater BMPs (rain gardens) and their associated infrastructure (flumes,
swales) be allowed in the ROW to maximize the volume of water that can be
treated and abstracted from this site. The homeowners’ association will be
responsible for maintenance of any grasses swales and rain gardens in the
adjoining right of way. The Town will own and maintain the concrete curbs and
flumes.
29.
Stormwater Management Plan: That prior to the issuance of a Zoning
Compliance Permit, the applicant shall submit a Stormwater Management Plan for
review and approval by the Town Manager. The plan shall be based on the
one-year, two-year, and 25-year frequency, 24-hour duration storms, where the
post-development stormwater run-off rate shall not exceed the pre-development
rate. The plan shall provide for the retention of stormwater run-off volume
for the two-year storm. Engineered stormwater facilities shall also remove 85
percent total suspended solids and treat the first inch of precipitation
utilizing NC Division of Water Quality design standards.