RESOLUTION A
(Revised Staff Recommendation)
A RESOLUTION APPROVING AN APPLICATION FOR A SPECIAL USE PERMIT MODIFICATION FOR STARBUCKS AT EASTGATE SHOPPING CENTER (2006-11-06/R-8a)
BE IT RESOLVED by the Council of the Town of Chapel Hill that it finds that the Special Use Permit Modification application proposed by Federal Realty Investment Trust for Starbucks at Eastgate Shopping Center on property identified as part of Orange County Parcel Identifier Number 9799-25-5527, if developed according to the site plans dated April 19, 2006, revised June 27, 2006, and the conditions listed below:
BE IT FURTHER RESOLVED that the Town Council hereby approves the application for a Special Use Permit Modification for Starbucks at Eastgate Shopping Center in accordance with the plans listed above and with the conditions listed below:
Stipulations Specific to the Development
Land Use Intensity | |
Net Land Area |
19,336 s.f. |
Total # of Buildings |
1 (existing) |
Maximum Floor Area |
1,920 s.f. (existing) |
Maximum Impervious Surface Area |
18,033 s.f. |
Maximum # of Parking Spaces |
23 |
Minimum # of Bicycle Spaces |
12 |
Stipulations Related to Transportation
Stipulations Related to Landscaping and Architecture
22. Required Buffers: That the following landscape buffer be provided; and if any existing vegetation is to be used to satisfy the buffer requirements, the vegetation will be protected by fencing from adjacent construction:
Required Landscape Buffers
Location |
Buffers Widths |
Northern Boundary (East Franklin Street frontage) |
5’-20’ Variable-Width Alternate Type ‘D’ External Buffer |
Southern Boundary (Eastgate Shopping Center Drive) |
0’-80’Varible-Width Buffer |
Eastern Boundary (adjacent to Brueggers Bagels) |
None |
23. East Franklin Street Frontage Alternate Landscape Buffers: That the applicant shall provide a 5 to 20-foot alternate type “D” variable width external landscape buffer along the East Franklin Street frontage, subject to Community Design Commission approval, prior to issuance of a Zoning Compliance Permit. Plans for supplemental plantings in the public right-of-way shall be approved by the Town Manager and NCDOT prior to issuance of a Zoning Compliance Permit.
24. Eastgate Shopping Center Drive Landscape Buffers: That the applicant shall provide a 0 to 80-foot type “D” variable width internal buffer along Eastgate Shopping Center Drive. The plans shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
25. Building Landscape Buffers: That the applicant shall provide a 5-foot wide landscape buffer around the building, according to Section 5.9.6(a) of the Land Use Management Ordinance. The plans shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
26. Landscape Protection Plan: That a detailed Landscape Protection Plan, clearly indicating which rare and specimen trees shall be removed and preserved, critical root zones of all rare and specimen trees, significant tree stands, detail of protective fencing and construction parking and materials staging/storage areas, and including Town standard landscaping protection notes, shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
27. Landscape Plan and Landscape Maintenance Plan: That a detailed Landscape Plan including a Landscape Maintenance Plan, shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit. The landscape plan shall indicate the size, type, and location of all proposed plantings as well as the limits of land disturbance and tree protection fencing.
28. Parking Lot Landscape Screening: That all parking areas shall be screened from view in accordance with the provisions of Section 5.6 of the Land Use Management Ordinance. The landscape screening plans shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
29. Parking Lot Shading Plan: That a parking lot shading plan shall be submitted in accordance with Section 5.9.6(d) of the Land Use Management Ordinance. The plan shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
30. Expanded Planting Strip or Potted Shrubs: That the applicant shall extend the vegetated planting area, contained with curbing, on the west side of the driveway from Eastgate Shopping Center Drive into the site, adjacent to Eastgate Shopping Center Drive at the Southeast corner of the site, or provide a grouping of potted shrubs. The plans shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
31. Provide Additional Vegetation Near the Southwest Corner of the Building: That the applicant shall provide additional plantings near the southwest corner of the building. These plantings shall be shown on a revised Landscape Plan, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
32. Replace Butterfly Bush With Approved Non-Invasive Plant Species: That the applicant shall replace Butterfly Bush and any other invasive species, with non-invasive species selected from the approved plant list in the Chapel Hill Design Manual, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
33. Building Elevations: That the Community Design Commission shall approve building elevations, lighting, including the location and screening of all HVAC/Air Handling Units for this project, prior to issuance of a Zoning Compliance Permit.
34. Lighting Plan: That the Community Design Commission shall approve a lighting plan for this site and shall take additional care during review to ensure that the proposed lighting plan will minimize 1) upward light pollution and 2) offsite spillage of light, prior to issuance of a Zoning Compliance Permit.
Stipulations Related to the Environment
35. Stormwater Management Plan: That prior to the issuance of a Zoning Compliance Permit the applicant shall submit a Stormwater Management Plan for review and approval by the Town Manager. The plan shall include low-impact stormwater management solutions and best management practices, such as bio-retention, pervious pavements, underground storage, infiltration trenches, vegetative swales and similar techniques.
The plan shall be based on the 1-year, 2-year, and 25-year frequency, 24-hour duration storms, where the post-development stormwater run-off rate shall not exceed the pre-development rate and the post-development stormwater runoff volume shall not exceed the pre-development volume for the local 2-year frequency, 24-hour duration storm event. Engineered stormwater facilities shall also remove 85% total suspended solids and treat the first inch of precipitation utilizing NC Division of Water Quality design standards.
36. Storm Drainageway Easement: That all stormwater management improvements, outside public right-of-way, shall be located inside reserved storm drainageway easements per Town guidelines. The recorded plat shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
37. Stormwater Operations and Maintenance Plan: That the applicant shall provide a Stormwater Operations and Maintenance Plan for all engineered stormwater facilities. We recommend that the plan include the owner's financial responsibility and include the maintenance schedule of the facilities to ensure that it continues to function as originally intended and shall be approved by the Town Manager, prior to the issuance of a Zoning Compliance Permit.
38. State or Federal Approvals: That any required State or Federal permits or encroachment agreements must be approved by the appropriate agencies and copies of the approved permits be submitted to the Town Manager prior to the issuance of a Zoning Compliance Permit.
39. Erosion Control: That a detailed soil erosion and sedimentation control plan, including provision for monitoring and maintenance of facilities and modifications of the plan if necessary, be approved by the County Erosion Control Officer and the Town Manager prior to issuance of a Zoning Compliance Permit. That a performance guarantee shall be provided, if more than one acre of land is disturbed, in accordance with Section 5-97.1 of the Town Code of Ordinances prior to issuance of any permit to begin land-disturbing activity.
40. Silt Control: That the applicant takes appropriate measures to prevent and remove the deposit of wet or dry silt on adjacent paved roadways.
Stipulations Related to Utility and Service
41. Solid Waste Management Plan: That a Solid Waste Management Plan, including provisions for private waste and recycling collection, and for managing and minimizing construction debris, shall be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
42. Solid Waste Final Plan Details: That final plans shall include dimensioned details as well as appropriate signage and lighting for the refuse area, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit. That final plans shall also include the following notes:
a. Prior to demolition or construction activity on the site the applicant shall hold a deconstruction assessment conference with the County’s Solid Waste staff prior to issuance of a demolition permit.
b. Prior to any demolition or construction activity on site the applicant shall hold a pre-demolition/pre-construction conference with the County’s Solid Waste staff. This may be the same meeting held with other development officials.
c. Any gate design shall include gate retainers;
d. By Orange County Ordinance, clean wood waste, scrap metal and corrugated cardboard, all present in construction waste, shall be recycled; and
e. By Orange County Ordinance, all haulers of construction waste shall be properly licensed.
43. Utility/Lighting Plan Approval: That the final Utility/Lighting Plan be approved by Duke Energy, Orange Water and Sewer Authority, BellSouth, Public Service Company, Time Warner Cable, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
44. Utility Line Placement: That all new utility lines shall be placed underground. The applicant shall indicate proposed off-site utility line routing and upgrades required to service the site on Final Plans, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
45. Fire Flow: That a fire flow report for all new development shall be prepared and sealed by a registered professional engineer, which demonstrates that flows meet the minimum requirements of the Town Design Manual, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
Miscellaneous Stipulations
46. Construction Management Plan: That the applicant shall provide a Construction Management Plan, indicating how construction vehicle traffic will be managed, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
47. Traffic and Pedestrian Control Plan: That the applicant shall provide a Traffic Management Plan for movement of motorized and non-motorized vehicles on any public street that will be disrupted during construction, including detour information and a pedestrian management plan indicating how pedestrian movements will be safely maintained, subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
48. Open Burning: That the open burning of trees, limbs, stumps and construction debris association with this development is prohibited.
49. Detailed Plans: That final detailed site plans, grading plans, utility/lighting plans, stormwater management plans (with hydrologic calculations), landscape plans and landscape maintenance plans be approved by the Town Manager prior to issuance of a Zoning Compliance Permit, and that such plans conform to the plans approved by this application and demonstrate compliance with all applicable conditions and the design standards of the Land Use Management Ordinance and the Design Manual.
50. As-Built Plans: That as-built plans in DWF binary format using State plane coordinates, shall be provided for street improvements and all other existing or proposed impervious surfaces prior to issuance of the first Certificate of Occupancy.
51. Certificates of Occupancy: That no Certificates of Occupancy shall be issued until all required public improvements are completed; and that a note to this effect shall be placed on the final plat.
That if the Town Manager approves a phasing plan, no Certificates of Occupancy shall be issued for an individual phase until all required public improvements for that phase are complete; no Building Permits for any phase shall be issued until all public improvements required in previous phases are completed to a point adjacent to the new phase, and if applicable a note to this effect shall be placed on the final plan and/or plat.
52. Construction Sign: That the applicant shall post a construction sign that lists the property owner’s representative and telephone number, the contractor’s representative and telephone number, and a telephone number for regulatory information at the time of issuance of a Building Permit, prior to the commencement of any land disturbing activities. The construction sign design shall be in accordance with Section 5.14.3(g) of the Land Use Management Ordinance. The sign design is subject to Town Manager approval, prior to issuance of a Zoning Compliance Permit.
53. Continued Validity: That continued validity and effectiveness of this approval is expressly conditioned on the continued compliance with the plans and conditions listed above.
54. Non-severability: That if any of the above conditions is held to be invalid, approval in its entirety shall be void.
BE IT FURTHER RESOLVED by the Council of the Town of Chapel Hill that the Council hereby approves the application for the Special Use Permit Modification application for Starbucks at Eastgate Shopping Center, as proposed by Federal Realty Investment Trust, in accordance with the plans and conditions listed above.
This the 6th day of November, 2006.