ATTACHMENT 1
1. |
Transit Capital Projects: (FY 2007-2011). |
Partial funding – FY 07
|
2. |
Upgrade Chapel Hill Signal System: Improve Chapel Hill signal system. |
Funded FY11 |
3. |
Martin Luther King Jr. Boulevard/NC 86 Corridor: I-40 to North Street- Bicycle and pedestrian improvements.* |
Partial funding FY 07 |
4. |
Old Durham-Chapel Hill Road: US 15-501 to I-40-Construct five-foot bikelanes* and sidewalks. |
Funded FY 09 and FY 10 |
5. |
Seawell School Road: Improvements from Homestead Road to Estes Drive Extension, including turn lanes, bicycle lanes*, sidewalks and transit accommodations. |
|
6. |
Homestead Road: NC 86 to High School Road, provide bicycle lanes*, sidewalks and turn lanes. |
|
7. |
Estes Drive: NC 86 to Curtis Road, widen existing roadway to include two 12-foot travel lanes, four-foot bicycle lanes* and sidewalks. |
|
8. |
Estes Drive Extension: Seawell School Rd. to Greensboro Street (Carrboro), add paved shoulders to accommodate bicycles. |
Funded FY 07 |
9. |
Community Center to Willow Drive: bicycle and pedestrian connection to Bolin Creek Greenway. |
|
10. |
Franklin Street/Bolin Creek Greenway Pedestrian/Bicycle Access: Install pedestrian/bicycle access between Franklin Street and Bolin Creek Greenway. |
|
11. |
Estes Drive: Curtis Road to Franklin Street, construct sidewalk along entire length and provide pedestrian signal at intersection with Chapel Hill Library Drive. |
|
12. |
Bolin Creek Greenway: Construct a greenway from Airport Road to Umstead Park. |
|
13. |
Barbee Chapel Road: NC 54 to Downing Creek Parkway, provide sidewalks and bicycle lanes*. |
|
14. |
Southern Railroad Greenway: Construct a greenway along the Southern Railroad right of way from Estes Drive to the UNC Horace Williams property. |
|
15. |
Pope Road - Ephesus Church Road: Construct five foot bicycle lanes*. |
|
16. |
Piney Mountain Road: Improvements from NC 86 to Riggsbee Road, including turn lanes, sidewalks, bicycle lanes* and transit accommodations. |
|
17. |
Mount Carmel Church Road: Improvements from US 15-501 South to Chatham County line, to be limited to include bicycle lanes*, sidewalks, transit and safety improvements. |
|
18. |
Country Club Road: Construct a sidewalk on the east side from South Road to Raleigh Street. |
|
19. |
Fordham Boulevard: Construct a sidewalk along the north side, Manning Drive to Carmichael Street. |
|
20. |
Bolin Creek/Little Creek Greenway: Construct a greenway from Chapel Hill Community Center to Pinehurst Drive. |
|
21. |
Old Mason Farm/Finley Golf Course Road: Construct bicycle lanes* and sidewalks. |
|
22. |
Erwin Road: Construct bicycle lanes*, sidewalks and safety improvements, Sage Road to Durham County line. |
|
23. |
Fordham Boulevard Corridor: US 15-501 South to Ephesus Church Road- bicycle and pedestrian Improvements.* |
|
24. |
NC 54 Corridor: Fordham Boulevard to Barbee Chapel Road- bicycle and pedestrian Improvements.* |
|
* Bicycle facilities will be determined consistent with the adopted 2004 Chapel Hill Bicycle and Pedestrian Plan.