1. |
Transit Capital Projects: (FY 2007-2011). (Partial funding FY07) |
2. |
Martin Luther King Jr.
Boulevard/NC 86 Corridor: I-40 to North Street- Bicycle and
pedestrian improvements. |
3. |
Bolin Creek Greenway: Construct a greenway from Martin Luther King Jr. Blvd. to Umstead Park. |
4. |
Homestead Road: NC 86 to High School Road, provide bicycle lanes, sidewalks and turn lanes. |
5. |
Seawell School Road: Improvements from Homestead Road to Estes Drive Extension, including turn lanes, bicycle lanes, sidewalks and transit accommodations. |
6. |
Pedestrian and Bicycle Overpass/Underpass Across Fordham Boulevard: Construct a pedestrian and bicycle overpass or underpass across Fordham Boulevard in the area between Manning Drive and Old Mason Farm Road. |
7. |
**Townwide Intersection Improvements: Safety improvements for pedestrians and bicyclists in 15 locations, as identified in 2006 Townwide pedestrian safety evaluation. |
8. |
Estes Drive: NC 86 to Curtis Road, widen existing roadway to include two 12-foot travel lanes, four-foot bicycle lanes and sidewalks. |
9. |
Estes Drive: Curtis Road to Franklin Street, construct sidewalk along entire length and provide pedestrian signal at intersection with Chapel Hill Library Drive. |
10. |
Pope Road - Ephesus Church Road: Construct sidewalks and five foot bicycle lanes. |
11. |
**Fordham Boulevard: Construct sidewalk from Ephesus Church Road to Elliott Road |
12. |
**Culbreth Road: Construct sidewalk from Adam Way to Smith Level Road |
13. |
Barbee Chapel Road: NC 54 to Downing Creek Parkway, provide sidewalks and bicycle lanes. |
14. |
Southern Railroad Greenway: Construct a greenway along the Southern Railroad right of way from Estes Drive to the UNC Horace Williams property. |
15. |
Franklin Street/Bolin Creek Greenway Pedestrian/Bicycle Access: Install pedestrian/bicycle access between Franklin Street and Bolin Creek Greenway. |
16. |
Piney Mountain Road: Improvements from NC 86 to Riggsbee Road, including turn lanes, sidewalks, bicycle lanes and transit accommodations. |
17. |
Mount Carmel Church Road: Improvements from US 15-501 South to Chatham County line, to be limited to include bicycle lanes, sidewalks, transit and safety improvements. |
18. |
Country Club Road: Construct a sidewalk on the east side from South Road to Raleigh Street. |
19. |
Fordham Boulevard: Construct a sidewalk along the north side, Manning Drive to Carmichael Street. |
20. |
Bolin Creek/Little Creek Greenway: Construct a greenway from Chapel Hill Community Center to Pinehurst Drive. |
21. |
Old Mason Farm/Finley Golf Course Road: Construct bicycle lanes and sidewalks. |
22. |
Erwin Road: Construct bicycle lanes, sidewalks and safety improvements, Sage Road to Durham County line. |
23. |
Fordham Boulevard Corridor: US 15-501 South to Ephesus Church Road- bicycle and pedestrian Improvements. |
24. |
NC 54 Corridor: Fordham Boulevard to Barbee Chapel Road- bicycle and pedestrian Improvements. |
** Newly added to Priority List