ATTACHMENT 2

 2009-2015 CHAPEL HILL TRANSPORTATION PRIORITY LIST

Adopted May 21, 2007

1.

Transit Capital Projects:  (FY 2007-2011). 

(Partial funding FY07)

2.

Martin Luther King Jr. Boulevard/NC 86 Corridor: I-40 to North Street- Bicycle and pedestrian improvements.
(Partial funding in prior years)

3.

Bolin Creek Greenway: Construct a greenway from Martin Luther King Jr. Blvd. to Umstead Park.

4.

Homestead Road: NC 86 to High School Road, provide bicycle lanes, sidewalks and turn lanes.

5.

Seawell School Road: Improvements from Homestead Road to Estes Drive Extension, including turn lanes, bicycle lanes, sidewalks and transit accommodations.

6.

Pedestrian and Bicycle Overpass/Underpass Across Fordham Boulevard: Construct a pedestrian and bicycle overpass or underpass across Fordham Boulevard in the area between Manning Drive and Old Mason Farm Road.

7.

**Townwide Intersection Improvements: Safety improvements for pedestrians and bicyclists in 15 locations, as identified in 2006 Townwide pedestrian safety evaluation.

8.

Estes Drive: NC 86 to Curtis Road, widen existing roadway to include two 12-foot travel lanes, four-foot bicycle lanes and sidewalks.

9.

Estes Drive: Curtis Road to Franklin Street, construct sidewalk along entire length and provide pedestrian signal at intersection with Chapel Hill Library Drive.

10.

Pope Road - Ephesus Church Road: Construct sidewalks and five foot bicycle lanes.

11.

**Fordham Boulevard: Construct sidewalk from Ephesus Church Road to Elliott Road

12.

**Culbreth Road: Construct sidewalk from Adam Way to Smith Level Road

13.

Barbee Chapel Road: NC 54 to Downing Creek Parkway, provide sidewalks and bicycle lanes.

14.

Southern Railroad Greenway: Construct a greenway along the Southern Railroad right of way from Estes Drive to the UNC Horace Williams property.

15.

Franklin Street/Bolin Creek Greenway Pedestrian/Bicycle Access: Install pedestrian/bicycle access between Franklin Street and Bolin Creek Greenway.

16.

Piney Mountain Road: Improvements from NC 86 to Riggsbee Road, including turn lanes, sidewalks, bicycle lanes and transit accommodations.

17.

Mount Carmel Church Road: Improvements from US 15-501 South to Chatham County line, to be limited to include bicycle lanes, sidewalks, transit and safety improvements.

18.

Country Club Road: Construct a sidewalk on the east side from South Road to Raleigh Street.

19.

Fordham Boulevard: Construct a sidewalk along the north side, Manning Drive to Carmichael Street.

20.

Bolin Creek/Little Creek Greenway: Construct a greenway from Chapel Hill Community Center to Pinehurst Drive.

21.

Old Mason Farm/Finley Golf Course Road: Construct bicycle lanes and sidewalks.

22.

Erwin Road: Construct bicycle lanes, sidewalks and safety improvements, Sage Road to Durham County line.

23.

Fordham Boulevard Corridor: US 15-501 South to Ephesus Church Road- bicycle and pedestrian Improvements.

24.

NC 54 Corridor: Fordham Boulevard to Barbee Chapel Road- bicycle and pedestrian Improvements.

** Newly added to Priority List