ATTACHMENT 1
RESOLUTION A
(Approving the Special Use Permit Application)
A RESOLUTION APPROVING AN
APPLICATION FOR A SPECIAL USE PERMIT FOR RESIDENCES AT GROVE PARK MULTI-FAMILY
DEVELOPMENT
BE IT RESOLVED by the Council of
the Town of Chapel Hill that it finds that Residences at Grove Park Special Use
Permit, Multi-Family Development proposed by Ram Development Company, on
property identified as Orange County Property Identifier Numbers: portions of
9788-39-4841 and 9788-39-4857; 9788-49-1706, 9788-49-4924; if developed
according to the Site Plan, dated February 20, 2007, last revised February 8,
2008, and the conditions listed below would:
- Be
located, designed, and proposed to be operated so as to maintain or promote the
public health, safety, and general welfare;
- Comply
with all required regulations and standards of the Land Use Management Ordinance:
- Be
located, designed, and operated so as to maintain or enhance the value of
contiguous property; and
- Conform
with the general plans for the physical development of the Town as embodied in
the Land Use Management Ordinance and in the Comprehensive Plan.
BE IT FURTHER RESOLVED by the
Town Council of Chapel Hill that it finds, in this particular case, that the
following modifications satisfy public purposes to an equivalent or greater
degree:
- Modification of Section 3.6.3(f)(1) to permit 37,955 square feet of
disturbed land area in the Upland zone of the Resource Conservation District.
- Modification of Section 3.6.3(f)(1) to permit 23,676 square feet of impervious
surface in the Upland zone of the Resource Conservation District.
This finding is based on a
determination that public purposes are satisfied to an equivalent or greater
degree because pedestrian, vehicular and emergency improvements are proposed
and a sensitive environmental area is to be improved.
BE IT FURTHER RESOLVED that the
Town Council hereby approves the application for a Special Use Permit for Residences at
Grove Park development in accordance with the plans listed above and with the conditions
listed below:
Stipulations
Specific to the Development
- Construction
Deadline: That construction begin by (two years
from Council approval) and be completed by (five years
from Council approval).
- Land Use Intensity: This Special Use Permit authorizes a multi-family development with:
Gross Land Area
|
12.9 Acres
|
Total Maximum Floor Area
Allowed
|
517,151 sq ft
|
Residential Units
|
346 units
|
Minimum Affordable bedrooms
|
52 bedrooms
|
Minimum Recreation Space
|
28,167 sq ft
|
Maximum Impervious Surface Area
|
365,087 sq ft
|
Maximum Land Disturbance in the
RCD
|
75,000 sq ft
|
Vehicular Parking Spaces
|
580 spaces
|
Bicycle Parking Spaces
|
110 spaces
|
Affordable
Housing
- Affordable Housing Plan: That the
applicant provide 52 bedrooms, dispersed throughout the development, to satisfy
the Council’s affordable housing policy and that the applicant agree to
implement a transfer fee policy for market rate homes. The applicant
shall enter into a Memorandum of Understanding with the Land Trust and the Town
to govern the use of such a fund. The Affordable Housing Plan
shall be reviewed and approved by the Town Manager prior to issuance of Zoning
Compliance Permit.
Schools
Adequate Public Facilities Ordinance
- Schools Adequate Public Facilities Ordinance: That the applicant
provides the necessary Certificate of Adequacy of Public Schools prior to the
issuance of a Zoning Compliance Permit.
Transportation
- Sight Distance at the
Entrance on Martin Luther King Jr. Boulevard: That the final plans and
final plat include sight distance triangles at the Martin Luther King Jr.
Blvd. driveway.
- Payment-in-lieu for Traffic
Signal Timing Plans: That the applicant provide a payment-in-lieu of
$5,000 to the Town to review and revise traffic signal timing plans prior
to issuance of a Zoning Compliance Permit for the following intersections:
- Martin Luther King Junior Blvd. and Hillsborough Street/Umstead
Drive
- Martin Luther King Junior Blvd. and Estes Drive
- Rosemary Street and Hillsborough Street
- Rosemary Street and Columbia Street
- Hillsborough Street and Franklin Street
- Turning Lane on Hillsborough
Street: That the applicant construct a left-turn lane on Hillsborough Street at
the site driveway prior to issuance of the first Certificate of
Occupancy provided that right-of-way acquisition from adjacent property
owners is not necessary for installation. The design and construction
details of the turning lane must be reviewed and approved by the Town
Manager prior to the issuance of a Zoning Compliance Permit.
- Hillsborough Street
Bus Pull-off: That the applicant construct a bus pull-off near the
site entrance on Hillsborough Street prior to issuance of the first
Certificate of Occupancy, provided that right-of-way acquisition from
adjacent property owners is not necessary for the installation. The
location, design and construction details, including solar generated
power, must be reviewed and approved by the Town Manager prior to the
issuance of a Zoning Compliance Permit.
- Martin Luther King Jr.
Boulevard Pedestrian Median-Refuge Island: That a pedestrian
median-refuge island on Martin Luther King Jr. Boulevard be constructed
near the site prior to issuance of the first Certificate of Occupancy. The
pedestrian median-refuge island location, design, and construction details
shall be subject to NCDOT and Town Manager approval prior to issuance of a
Zoning Compliance Permit. Alternatively, a payment-in-lieu of construction
may be submitted and approved by the Town Manager prior to issuance of a
Zoning Compliance Permit. The payment shall be refunded if the refuge
island is not installed within five years from the approval of the Zoning
Compliance Permit.
- Traffic Calming at North
Street and Hillsborough Street: That the applicant provide a
payment-in-lieu of $10,000 to the Town to install traffic calming devices
(e.g. overhead flashing lights) at the intersection of Hillsborough St.
and North St. or similar traffic calming measures as determined by the
Town Manager prior to issuance of a Zoning Compliance Permit.
- Hillsborough Street
Right-of-way Dedication: That prior to the issuance of a
Certificate of Occupancy the applicant shall dedicate right-of-way to one
foot behind the Hillsborough Street sidewalk. That the plat shall be
reviewed and approved by the Town Manager prior to recordation.
- Hillsborough Street
Sidewalk: That a 5-foot sidewalk shall be constructed to Town
Standards along the Hillsborough Street frontage including ADA compliance ramps
prior to issuance of a Certificate of Occupancy. The
sidewalk plans shall be reviewed and approve by the Town Manager prior to
issuance of a Zoning Compliance Permit.
- Retaining Walls: That
the final design and location of all retaining walls shall be approved by
the Town Manager prior to issuance of a Zoning Compliance Permit. That
land disturbance associated with construction of retaining walls within
the Resource Conservation District shall be minimized and no retaining
walls be constructed within the southern landscape buffer without approval
by the community Design Commission for an Alternative Buffer.
- Driveway Construction: That
curb and gutter shall be constructed on both sides of the driveway(s)
and that such construction shall be completed to Town Standard.
- Accessibility Requirements: The
applicant shall design all handicapped parking spaces, ramps, and
crosswalks, and associated infrastructure according to Americans with
Disabilities Act standards, North Carolina Accessibility Code, and Town
standard. Code requirements include standards for the number, size and spacing
of handicapped spaces, travel distance from parking spaces to
buildings, ramp and sidewalk slope and other considerations. That the
final design shall be reviewed by the Town Manager prior to issuance of a
Zoning Compliance Permit.
- Cross-Access Easement: That
the applicant shall provide a vehicular access easement to the south
property line for potential future pedestrian and vehicular cross-access.
That the easement shall be reviewed and approved by the Town Manager and
recorded at Orange County Register of Deeds prior to issuance of a Zoning
Compliance Permit.
- Bus Transit Improvements: That
prior to the issuance of a Certificate of Occupancy, the applicant
shall provide the following improvements to the bus transit system:
- Hillsborough Street bus stop
to be improved with a bus-stop shelter and Real Time signage including
solar generated passenger information system (if permitted solar
orientation) and to be located within the Hillsborough Street
right-of-way dedication or an easement.
- Martin Luther King Jr. Blvd.
bus stop on the east side of the street north of the driveway be improved
with a bus-stop shelter, bench, and Real Time signage including solar
generated passenger information system (if permitted solar orientation).
- Bicycle Parking: That
the bicycle parking spaces comply with the Class I and Class II bicycle parking
standards in the Design Manual.
Landscaping
and Elevations
- Landscape
Buffers: That the applicant shall provide the following landscape buffers:
Location
|
Bufferyard
|
Martin Luther King Jr. Blvd.
& Hillsborough Street
|
None
|
All other property lines
|
Type
“B” / minimum 10’ wide
|
- Landscape Screening and
Shading: That the following landscaping standards of the
Land Use Management Ordinance be provided:
- Section 5.9.6(a): 5-foot wide
planting strip around buildings
- Section 5.9.6(d): parking lot
shading requirements
- Preservation of Rare Oak
Trees: That the 50-inch, 40-inch, and 30-inch DBH oak trees located
between Building 4 and the parking lot be protected with temporary chain
link tree protection fencing around their critical root zones at a
minimum. The location and design of the fencing shall be approved by the
Town Manager prior to issuance of a Zoning Compliance Permit.
- Landscape
Protection Plan: That a detailed Landscape Protection Plan, clearly
indicating which rare and specimen trees shall be removed and preserved,
critical root zones of all rare and specimen trees, detail of protective
fencing including chain link fencing and construction parking and materials
staging/storage areas, and including Town standard landscaping protection
notes, shall be approved by the Town Manager prior to issuance of a Zoning
Compliance Permit.
That the plan
shall also provide tree protection fencing for all land disturbances proposed
off-site and along the entire limits of disturbance associated with
improvements on Hillsborough Street and Martin Luther King Jr. Blvd.
- Landscape Plan and Landscape
Maintenance Plan: That a detailed Landscape Plan and a Landscape
Maintenance Plan, shall be approved by the Town Manager prior to issuance
of a Zoning Compliance Permit. The landscape plan shall indicate the size,
type, and location of all proposed plantings as well as the limits of land
disturbance and tree protection fencing.
- Kudzu Management: That
the applicant shall provide information for the management of invasive
exotic plant growth and have the management method approved by the Town
Manager prior to issuance of a Zoning Compliance Permit.
- Building Elevations:That the Community Design Commission shall approve building elevations
including the location and screening of all HVAC/Air Handling Units for this
project, prior to issuance of a Zoning Compliance Permit.
- Lighting Plan: That
the Community Design Commission shall approve a lighting plan for this site and
shall take additional care during review to ensure that the proposed lighting
plan will minimize 1) upward light pollution and 2) offsite spillage of light,
prior to issuance of a Zoning Compliance Permit.
Resource
Conservation District
- Resource Conservation
District Encroachment: That a Resource Conservation District
Encroachment shall be obtained prior to the issuance of a Zoning
Compliance Permit for land disturbance proposed within the Resource
Conservation District including driveway widening, erosion and sediment
control measures, and stormwater management.
- Land Disturbance Activity
Limited in the Resource Conservation District: That land disturbance
within the Resource Conservation District shall be minimized to the extent
necessary in order to construct the permanent stormwater management
outfall structure and associated piping, to construct the road entrance,
and to install the necessary erosion and sediment control measures for the
construction site, subject to review and approval by the Town Manager.
Land disturbance within the Resource Conservation District shall be
limited to 75,000 square feet.
- Boundaries:That the boundaries of the Resource Conservation District be indicated on the
final plat and plan. A note shall be added to all final plats and final plans,
indicating, “Development shall be restricted within the Resource Conservation
District in accordance with the Chapel Hill Land Use Management Ordinance.”
- Impervious
Surface Limited in the Resource Conservation District: The impervious
surface within the Resource Conservation District shall be minimized to the
extent necessary in order to construct the driveway improvements, subject to
review and approval by the Town Manager. Impervious surface within the Resource
Conservation District shall be limited to 30,742 square feet.
Environment
- Steep Slopes: That prior to issuance of a Zoning Compliance
Permit, the applicant shall include a map indicating how development and
construction will comply with the steep slopes regulations in the Land Use
Management Ordinance, subject to Town Manager review and approval:
- for slopes of 10 - 15%, site preparation techniques shall be used
which minimize grading and site disturbance;
- for slopes of 15 - 25%, demonstrate specialized site design
- techniques and approaches for building and site preparation; and
- for slopes of 25% or greater, provide a detailed site analysis of
soil conditions, hydrology, bedrock conditions, and other engineering or
environmental aspects of the site.
- Energy
Efficiency That the Final Plans incorporate a “20 percent more
energy efficient” feature relative to the energy efficiency standard of the
American Society of Heating, Refrigeration, and Air Conditioning Engineers
(ASHRAE), as amended and in effect at the time of building permit issuance.
Comparable standards generally recognized as applicable to building energy
consumption, as amended and in effect at the time of building permit issuance,
may be used by the applicant when incorporating the “20 percent more energy
efficient” feature into the final plans.
- Energy
Management Plan That the final plan application include an Energy
Management Plan. The plan shall: a) consider utilizing sustainable
energy, currently defined as solar, wind, biofuels, and hydroelectric power; b)
consider purchase of carbon offset credits and green power production through
coordination with the NC GreenPower program; c) provide for 20 percent more
efficiency that ensures indoor air quality and adequate access to natural
lighting, and allows for the proposed utilization of sustainable energy in the
project; d.) include on-going energy management practices, and e) that the
property owner reports to the Town of Chapel Hill both the expected energy
consumption as part of a model prior to issuance of a Zoning compliance Permit
and the actual energy consumption as par to sealed engineering calculations at
the time construction is completed.
- Stormwater Management Plan: That
prior to the issuance of a Zoning Compliance Permit the applicant
shall submit a Stormwater Management Plan for review and approval by the
Town Manager. The plan shall include low-impact stormwater management
solutions and best management practices, such as bio-retention, pervious
pavements, underground storage, infiltration trenches, vegetative swales
and similar techniques.
The plan shall
be based on the 1-year, 2-year, and 25-year frequency, 24-hour duration storms,
where the post-development stormwater run-off rate shall not exceed the
pre-development rate and the post-development stormwater runoff volume shall
not exceed the pre-development volume for the local 2-year frequency, 24-hour
duration storm event. Engineered stormwater facilities shall also remove 85%
total suspended solids and treat the first inch of precipitation utilizing
Town’s Design Manual.
- Level Spreader within
Resource Conservation District: That the level spreader shall be
located within the Resource Conservation District with special attention
paid to design of thedissipater at the outfall.
- Storm Drainageway Easement: That
all stormwater management improvements, outside public right-of-way,
shall be located inside reserved storm drainageway easements, per Town
guidelines, to be approved by the Town Manager prior to recordation.
- Stormwater Operations and
Maintenance Plan: That a Stormwater Operations and Maintenance Plan
shall be provided for the proposed stormwater management facilities and
submitted to the Stormwater Management Engineer for approval prior to
issuance of a Zoning Compliance Permit. A schedule of inspection and
maintenance tasks shall be included. A maintenance covenant shall be
included as part of the plan and recorded at the office of the Orange
County Register of Deeds prior to issuance of a Zoning Compliance Permit.
- Erosion Control: That a
detailed soil erosion and sedimentation control plan, including provision
for monitoring and maintenance of facilities and modifications of the plan
if necessary, shall be approved by the County Erosion Control Officer and
the Town Manager prior to issuance of a Zoning Compliance Permit.
If one (1)
acre or more is uncovered by land-disturbing activities for this project, then
a performance guarantee in accordance with Section 5-97.1 Bonds of the Town
Code of Ordinances shall be required prior to final authorization to begin land-disturbing
activities. This financial guarantee is intended to cover the costs of
restoration of failed or failing soil erosion and sedimentation controls, and/or
to remedy damages resulting from land-disturbing activities, should the responsible
party or parties fail to provide prompt and effective remedies acceptable to
the Town.
- Silt Control: That the
applicant takes appropriate measures to prevent and remove the deposit of
wet or dry silt on adjacent paved roadways. During
the construction phase, additional erosion and sediment controls may be
required if the proposed measures do not contain the sediment. Sediment
leaving the property is a violation of the Town’s Erosion and
Sediment Control Ordinance.
- Curb Inlets: In lieu of
stenciling, all new Town and State right-of-way and private curb inlet
hoods/covers installed within the Chapel Hill Planning Jurisdiction shall
be pre-cast stating, "Dump No Waste! Drains to Jordan Lake", in
accordance with the specifications of the Town Standard Detail SD-5A.
Recreation
- Recreation Improvements: That
the applicant shall provide 28,167 square feet of recreation space.
That the recreation space associated with the pool, clubhouse, bocce
court, and fitness center shall be considered suitable recreation space if
designed in a manner acceptable to the Town Manager. That if the full
amount of required recreation space cannot be provided with the facilities
listed above or other facilities approved by the Town Manager, the
applicant shall provide a payment-in-lieu of providing the remaining
required recreation space. Any such payment amount shall be reviewed and
approved by the Town Manager in accordance with the Land Use Management
Ordinance. Any recreation payment amount shall be submitted to the Town
prior to issuance of a Zoning Compliance Permit.
- Greenway Easement: That
a greenway easement shall be provided within the Resource Conservation
District to be reviewed and approved by the Town Manager and recorded at
Orange County Land Records prior to issuance of a Zoning Compliance
Permit.
Water,
Sewer, and Other Utilities
- Overhead
Power Lines: That all proposed or relocated utility lines other then
3-phase electric power distribution lines shall be located underground. That
the existing utilities along Hillsborough Street shall be relocated
underground, unless a letter from Duke Energy does not support burial.
- Utility/Lighting
Plan Approval: That the final utility/lighting plan shall be approved by
Orange Water and Sewer Authority, Duke Energy Company, TimeWarner Cable, Public
Service Company, AT & T or GTE, and the Town Manager before issuance of a
Zoning Compliance Permit. The property owner shall be responsible for assuring
that these utilities, including cable television, are extended to serve the
development.
- OWASA
Easements: That easement documents as required by OWASA and the Town
Manager shall be recorded before issuance of a Certificate of Occupancy.
- Sub-Metering
of Water Use: That the applicant provide a system and management
arrangement to ensure sub-metering and billing for water use by each dwelling
unit within the development. The sub-metering system and arrangements must be
approved by the Town Manager prior to issuance of a Certificate of Occupancy,
and must meet the requirements of the North Carolina Utilities Commission.
State
and Federal Approvals
- State
or Federal Approvals: That any required State or federal permits or
encroachment agreements shall be approved and copies of the approved permits
and agreements be submitted to the Town of Chapel Hill prior to the issuance of
a Zoning Compliance Permit.
- NCDOT
Approvals: That plans for improvements to State-maintained roads shall be
approved by NCDOT prior to issuance of a Zoning Compliance Permit for the
subject phase of development.
Fire
Safety
- Driveway
Entrances for Fire Access: That all driveway entrances from Martin Luther King
Jr. Blvd. and Hillsborough Street shall be a minimum of 20 feet wide.
- Bicycle/Pedestrian/Fire
Access Path: That the applicant shall construct two adjacent
8-foot wide off-street bicycle/pedestrian paths within the open area between
the buildings. Two adjacent, concrete paths are to be separated by four feet
and combined to form a 20-foot fire access. Break-away bollards and roll curbs
are to be erected at the entrances to the bicycle/pedestrian/fire access path.
- Fire
Flow Report: That a fire flow report, sealed by an engineer registered in
the State of North Carolina, shall be provided for review and approval by the
Town Manager prior to issuance of a Zoning Compliance Permit.
- Automatic
Sprinkler System: That the applicant shall install automatic sprinkler
systems in accordance with Town Code and NC Fire Code.
- Fire
Hydrant Accessibility: That all structures must be located within 500 feet
of a fire hydrant. That the applicant maintain a 50-foot maximum distance
between fire hydrants and fire department connections, in a clearly visible and
accessible location on the street side of buildings.
Solid
Waste Management and Recycling
- Solid
Waste Management Plan: That a detailed Solid Waste Management Plan,
including a recycling plan and a plan for managing and minimizing construction
debris, shall be approved by the Town Manager prior to issuance of a Zoning
Compliance Permit. That the approved plan shall include the following:
- A detail showing the layout of the recycling collection area.
Adequate passage must be provided between the carts at the rear of the
compactor and the fence for cart use. The internal fence around the cardboard
dumpster be removed and bollards placed behind the dumpster.
- That the applicant holds pre-demolition and pre-construction
conferences with Orange County Solid Waste staff.
- That the applicant holds a deconstruction assessment meeting
with Orange County staff concerning the buildings to be removed from this site.
- That the following notes be placed on the final plans: 1. Any
gate design will include gate retainers, 2. The user will be responsible for
opening gates to the dumpster area on collection days of any material(s) to be
collected from this location, 3. If any vehicles are parked in the reuse or
recyclable collection vehicle access area, the containers will no receive
service until the next scheduled collection day.
- That the collection vehicle access route to any area
containing recyclable material collection containers be paved with all-weather,
heavy-duty pavement OR the following note be included on the plans and recorded
on the plat: “Orange County will not be responsible for any pavement damage
that may result from service vehicles.”
- That the applicant contact Orange County Solid Waste to
request multi-family recycling services when the residential units are ready
for occupants.
- That the revised plans show lighting details that adequately
illuminate the recycling and refuse site.
- The intended path of service to/from the recycling carts must
be provided and a handicapped service door and ramp be provided for cart
access.
- That the applicant contacts Orange County Solid Waste in order
to maximize recycling of demolition waste from the existing structures.
- Number
of Recycling Carts: That a minimum of 18 recycling carts shall be provided
and location shown on the plans, subject to Town Manager approval, prior to
issuance of a Zoning Compliance Permit.
Miscellaneous
Stipulations
- Construction
Management Plan: That a Construction Management Plan, be approved by the
Town Manager prior to issuance of a Zoning Compliance Permit and show designation
of Martin Luther King Jr. Blvd. entrance as the primary construction entrance
for the site, prohibition of construction traffic on Hillsborough Street except
for construction traffic on Hillsborough Street north of the site when traffic
is needed for Hillsborough Street improvements and when the Martin Luther King
Jr. Blvd. entrance cannot be used. The construction management plan shall: 1)
indicate how construction vehicle traffic will be managed, 2) identify parking
areas for on-site construction workers including plans to prohibit parking in
residential neighborhoods, 3) indicate construction staging and material
storage areas, and 4) identify construction trailers and other associated
temporary construction management structures.
- Traffic
and Pedestrian Control Plan: That the applicant shall provide a Work Zone
Traffic Control Plan for movement of motorized and non-motorized vehicles on
any public street that will be disrupted during construction. The plan must
include a pedestrian management plan indicating how pedestrian movements will
be safely maintained. The plan must be reviewed and approved by the Town
Manager prior to the issuance of a Zoning Compliance Permit. At least 5
working days prior to any proposed lane or street closure the applicant must
apply to the Town Manager for a lane or street closure permit.
- Construction
Sign Required: That the applicant shall post a construction sign at the
development site that lists the property owner’s representative and telephone
number, the contractor’s representative and telephone number, and a telephone
number for regulatory information at the time of issuance of a Building Permit,
prior to the commencement of any land disturbing activities. The construction
sign may have a maximum of 16 square feet of display area and may not exceed 6
feet in height. The sign shall be non-illuminated, and shall consist of light
letters on a dark background. A detail of the sign shall be reviewed and
approved by the Town Manager prior to the issuance of a Zoning Compliance
Permit.
- Detailed
Plans: That final detailed site plans, grading plans, utility/lighting
plans, stormwater management plans (with hydrologic calculations), landscape
plans, and landscape maintenance plans shall be approved by the Town Manager
before issuance of a Zoning Compliance Permit, and that such plans conform to
plans approved by this application and demonstrate compliance with all
applicable regulations and the design standards of the Land Use Management
Ordinance and the Design Manual.
- Certificates
of Occupancy: That no Certificates of Occupancy shall be issued until all
required public improvements are complete; and that a note to this effect shall
be placed on the final plats.
If the Town
Manager approves a phasing plan, no Certificates of Occupancy shall be issued
for a phase until all required public improvements for that phase are complete;and
no Building Permits for any phase shall be issued until all public improvements
required in previous phases are completed to a point adjacent to the new phase;and
that a note to this effect shall be placed on the final plats.
- As-built Plans: The
applicant shall provide certified as-built plans for building footprints,
parking lots, street improvements, storm drainage systems and stormwater
management structures, and all other impervious surfaces. The
as-built plans should be in DXF binary format using State plane
coordinates and NAVD 88.
- Traffic
Signs: That the property owners shall be responsible for placement and
maintenance of temporary regulatory signs before issuance of any Certificates
of Occupancy.
- New
Street Names and Numbers: That the name of the development and its streets
and house/building numbers be approved by the Town Manager prior to issuance of
a Zoning Compliance Permit.
- Vested
Right: This Special Use Permit constitutes a site specific development plan
establishing a vested right as provided by N.C.G.S. Section 160-185.1 and
Appendix A of the Chapel Hill Land Use Management Ordinance.
- Continued
Validity: That continued validity and effectiveness of this approval shall
be expressly conditioned on the continued compliance with the plans and
conditions listed above.
- Non-Severability:That if any of the above conditions is held to be invalid, approval in its
entirety shall be void.
BE IT FURTHER
RESOLVED that the Council hereby approves the Special Use Permit for Residences
at Grove Park Development.
This the _____