REVISED
RESOLUTION A
A RESOLUTION APPROVING AN APPLICATION FOR A MASTER LAND USE
PLAN FOR WOODMONT DEVELOPMENT (2008-09-08/R-12a)
BE IT RESOLVED by the Council of the Town of Chapel Hill
that the Council finds that the Master Land Use Plan application, proposed by
Capital Associates, on property identified as Durham County Parcel Identifier
Numbers 9798-04-93-2035, 9798-04-92-0930, 9798-04-82-9499, 9798-04-82-6093,
9798-04-81-1816, 9798-04-71-8729, and 9798-04-82-6534, if developed according
to the site plan dated November 21, 2007 and revised January 10, 2008, March 10,
2008, March 13, 2008, March 27, 2008, and August 5, 2008, and the conditions
listed below:
- Would maintain or promote the public health, safety, and general
welfare;
- Would maintain or enhance the value of contiguous property, and
- Would conform to the Comprehensive Plan.
BE IT FURTHER RESOLVED that the Town Council hereby approves
the application for the Master Land Use Plan for the Woodmont Development in
accordance with the plans listed above and with the conditions listed below:
Stipulations
Specific to the Development
- Master Land Use Plan Expiration: That the Master Land Use Plan
expire on September 8, 2015.
- Land Use Intensity: That this Master Land Use Plan approves a
total Floor Area of 601,000 square feet with 427,100 square feet of office-type
business, 150,400 square feet of residential, and 23,500 square feet of
general/convenience business uses.
- Master Land Use Plan Modification: That this Master Land Use Plan
may be modified by the procedures described in Section 4.8 of the Land Use
Management Ordinance, and that any future Master Land Use Plan Modification shall
include:
- A revised Traffic Impact Analysis
- Energy Management Plan (or other Sustainability Plan)
- Transportation Management Plan
- Stormwater Management Plan
Access and Circulation
Phase One Roadway and Greenway Improvements:
- Traffic Signal Payment-in-Lieu: Prior to a Zoning Compliance
Permit for Phase I, the applicant shall provide a payment-in-lieu of $5,000 to
the Town to review and revise the traffic signal timing plans at the following
intersections:
- NC 54/Barbee Chapel Road/E. Barbee Chapel Road
- NC 54/Meadowmont Lane/Friday Drive
- NC 54/W. Barbee Chapel Road
- NC 54/Burning Tree Drive/Finley Golf Course Road
- NC 54/Hamilton Road
- Barbee Chapel Road and Finley Forest Road/Site Entrance Intersection:Prior
to the first Certificate of Occupancy for Phase I, the applicant shall:
- Construct a right turn lane with appropriate storage and
appropriate taper on northbound of Barbee Chapel Road.
- Construct a left turn lane with appropriate storage and appropriate
taper on southbound of Barbee Chapel Road.
- Improve the frontage along Barbee Chapel Road with the above
travel lanes, concrete sidewalk, standard curb & gutter, utility strip, and
additional pavement width for a bicycle lane.
- Construct a three (3) lane cross-section consisting of one ingress lane
and two egress lanes on Westbound of Site Entrance. The egress lanes should
consist of an exclusive right-turn lane and a combination of through/left-turn
lane.
The design and
construction details of the above improvements must be reviewed and approved by
the Town Manager and the North Carolina Department of Transportation prior to
the issuance of a Zoning Compliance Permit.
- Raleigh Road (NC 54) and Barbee Chapel Road
Intersection: Prior to the first Certificate of Occupancy for Phase I, the
applicant shall:
- Construct an additional exclusive left-turn lane with appropriate
storage and appropriate taper on northbound of Barbee Chapel Road.
- Convert the existing through-right lane into exclusive through-left
lane on northbound of Barbee Chapel Road.
- Construct an exclusive right-turn lane with appropriate storage
and appropriate taper on northbound of Barbee Chapel Road.
- Upgrade the traffic signal to include the above roadway
improvements with pedestrian amenities on all approaches with street imprinted
crosswalks, countdown pedestrian heads, and bicycle activated loops.
The design and
construction details of the above improvements must be reviewed and approved by
the Town Manager and the North Carolina Department of Transportation prior to
the issuance of a Zoning Compliance Permit.
- Traffic Signal Payment-in-Lieu: Prior to issuance of a Zoning
Compliance Permit for the first phase of development, the applicant shall
submit a payment-in-lieu for the installation of a traffic signal at the
intersection of Barbee Chapel Road and the new street proposed as part of this
development. The cost estimate shall provide for the installation of mast arms
and pedestrian signals. If a traffic signal is not warranted within five years
after full build-out of the project, the payment will be returned to the
applicant.
- Greenway and Bike Path: Prior to issuance of a Zoning
Compliance Permit for first phase of development the applicant shall submit
final greenway/bike path plans for approval by the North Carolina Department of
Transportation and the Town Manager. The greenway/bike path shall be installed
prior to a Certificate of Occupancy for the second phase of the project.
Phase Two Roadway and Greenway Improvements:
- Greenway Hike/Bike Trail: That the portion of the existing
hike/bike trail that runs along the NC 54 frontage from Barbee Chapel Road to
Little John Road be constructed as part of Phase II of the development. That
the trail be located outside of any landscaped buffers, and that signage be
included at entrances to the trail. Final Plans shall be approved by the Town
Manager. That the greenway intersecting Barbee Chapel Road shall be aligned
towards the north in order to line up with the existing NC 54 greenway on the
west side of Barbee Chapel Road.
If the Woodmont development is approved with a new street
connection to NC 54 then Stancell Drive should be realigned to provide greater
distance between NC 54 and Stancell Drive.
- Public Street through the Site connecting Barbee Chapel Road and
Raleigh Road: The main internal street transecting the site must be a
public street. Construct the proposed internal street to Town of Chapel Hill standard:
- With a 27 foot wide public street cross-section with standard 30
inch curb & gutter, 3 foot wide utility strip, 5 foot wide concrete
sidewalk on both sides of the street, traffic calming, and dedication of a 45
foot wide right-of-way to the Town.
- The section from NC 54 to a point approximately 300 feet south
shall be constructed as a 3 lane section.
- No angled on-street parking is permitted.
- The distances between the driveways must be consistent with Town
of Chapel Hill public street design.
The design and
construction details of the above improvements must be reviewed and approved by
the Town Manager and the North Carolina Department of Transportation prior to
the issuance of a Zoning Compliance Permit.
- Little John Road: Prior to the issuance of a Certificate of Occupancy
for Phase II, the applicant shall:
- Improve the Little John Road frontage to Town Standard with 20
feet of strip asphalt paving and shoulder, roadside ditch.
- Dedicate public right-of-way to a point eight feet behind the
back of ditch.
- Provide payment-in-lieu to the Town for construction of sidewalk
along the site frontage on Little John Road.
- Pedestrian Connection and Easement: Prior to a Certificate of Occupancy
for phase two, provide a pedestrian connection and easement between Little John
Road and the proposed internal street. The details of connection and easement
are subject to approval by the North Carolina Department of Transportation and
the Town Manager.
- Raleigh Road (NC 54) and Site Entrance Intersection: Prior to a
Certificate of Occupancy for Phase II:
- New Crossover: That the applicant shall install a new crossover,
subject to the approval of N.C. Department of Transportation.
- If the crossover is approved by the N.C. Department of Transportation:
- Construct an exclusive left-turn lane with 300
feet of full storage and appropriate transitional taper on westbound NC 54.
This recommendation is conditioned on N.C. Department of Transportation approval
of closing the median break at Little John Road and the construction of
a left-over type intersection at the Downing Creek Parkway and NC 54.
- Construct an exclusive right-turn lane with 200
feet of full storage and appropriate transitional taper.
- Install a traffic signal with pedestrian
amenities and bicycle activated loops. If a traffic signal is not approved by
the N.C. Department of Transportation, a payment-in-lieu for the
installation of a traffic signal shall be made to the Town. The cost estimate
shall provide for the installation of mast arms and pedestrian and bicycle
amenities. If a traffic signal is not warranted within five years after full
build-out of the project the payment will be returned to the applicant.
- Construct a
three (3) lane cross-section consisting of
one ingress lane and two egress lanes. The egress lanes shall consist of an
exclusive right-turn lane and an exclusive left-turn lane.
The design and construction details
of the above improvements must be reviewed and approved by the Town Manager and
the North Carolina Department of Transportation prior to the issuance of a
Zoning Compliance Permit.
- Raleigh Road (NC 54) and Meadowmont Lane/Friday Center Drive: Prior to
the Certificate of Occupancy for the second phase, the applicant shall upgrade
the traffic signal at this intersection to include pedestrian crosswalks and
countdown heads crossing NC 54 and install bicycle activated loops. The design
and construction details of the signal upgrades must be reviewed and approved
by the Town Manager and the North Carolina Department of Transportation prior
to the issuance of a Zoning Compliance Permit.
- Stancell Drive: Prior to the Certificate of Occupancy for Phase II, the
applicant shall relocate Stancell Drive to the south of the existing alignment
with NC 54 and the Site Entrance (creating a “jug handle”) including dedication
of necessary public right-of-way. This realignment will provide necessary
separation between Stancell Drive and the new NC 54 intersection that is
proposed as part of this application. The design and construction details of
the relocation of Stancell Drive must be reviewed and approved by the Town
Manager and the North Carolina Department of Transportation prior to the
issuance of a Zoning Compliance Permit.
- Stancell Drive Improvements: That the portion of Stancell Drive, along
the property frontage be improved to Town standard, with standard 30” curb and
gutter, five-foot concrete sidewalks, and three-foot wide utility strip.
- Payment-In-Lieu for Park-Ride/Transit: Prior to the Zoning Compliance
Permit for Phase I, the applicant shall provide a payment-in-lieu of $100,000
to be used for transit and park/ride.
Other Roadway Stipulations
for all phases:
- Additional Subsequent Roadway Improvements: Other roadway
improvements may be required depending on the revised transportation analyses
as part of a Master Land Use Plan or Special Use Permit approval for Phases II
and III.
- Access Easements: That the applicant shall provide public
access easements to the east, south and west of the site, subject to Town
Manager approval.
- Internal Pedestrian Trail: That the connections identified on the
approved plans to the west and the south remain in place.
- Sight Distance: That the applicant shall provide sight distance
triangles and provide clear lines of sight where the proposed street would
intersect with the public streets and private driveways, subject to Town
Manager approval.
- Street Sign, Street Light, Pavement Marking Plan: Prior to a Zoning
Compliance Permit for each phase, the applicant shall provide a street sign,
pavement marking and street light plan for approval by the Town Manager.
- Heavy Duty Pavement: A heavy duty pavement design shall be provided
for all driveways and drive aisles that will provide access for solid waste
collection.
- Shuttle: That when determined necessary by the Town Manager, the
applicant will provide shuttle service between the Woodmont site and
Meadowmont.
Buffers and
Landscaping
- Buffer Requirements:
Location
|
Bufferyard
Required
|
Portion of Southern Property
Line;
Portion of Property Line south
of Pearl Lane
|
Type “B” / 10’ wide
|
All other Boundaries
|
Type “C “ / 20’ wide
|
- Hike/Bike
Path and Buffers: That the hike/bike path be located outside of any
required buffers.
- Tree
Preservation: That at the Final Plan stage the applicant shall provide a
comprehensive tree planting plan showing the amount of the site that will
ultimately be covered by tree canopy, in order for the staff to do an analysis
of net loss of trees.
Stormwater
- Watershed
Protection/Impervious Surface: That the impervious surface associated with
the development shall not exceed 50%.
- Stormwater
Management Plan: That future Special Use Permit applications be subject to
the Town’s most recent stormwater management ordinance. That low impact design
stormwater management techniques be integrated into future submittals.
- Resource
Conservation District: That no land disturbance be permitted in the
Resource Conservation District.
Energy Management Plan
- Energy
Management/ Sustainability: That future Special Use Permit applications be
subject to the Council’s most recent policy or ordinance regarding energy
management and/or sustainability.
- Energy
Management Plan Matrix: That the applicant provide a matrix for all Energy
Management Plan specifics for each building in each phase.
- Energy
Management Plan Engineering Calculations: That sealed engineering
calculations which demonstrate the actual performance of each building compared
to ASHRAE standards be submitted to the Planning Department and the Inspections
Department no more than 30 days after the Certificate of Occupancy for each
building has been issued.
Miscellaneous
- Public Art:
- All Phases: An artwork
construction and installation plan shall be approved by the Town Manager prior
to the issuance of a Zoning Compliance Permit. Request for
Qualifications/Request for Proposals and method of artist selection shall be
agreed upon by the applicant and the Public Art Administrator. Should the
applicant choose to employ an outside public art consultant, said consultant,
the initiated process, and contract must be approved by the Public Art
Administrator.
- Phase I: The applicant shall
provide an initial payment of $25,000 to the Town of Chapel Hill for public
artwork at the development site prior to the issuance of a Zoning Compliance
Permit for Phase I. Prior to the issuance of a Certificate of Occupancy for
Phase I, the applicant shall provide an additional $50,000 for public artwork
for Phase I.
- Phase II: Prior to the issuance
of a Zoning Compliance Permit for Phase II, the applicant shall provide an
additional $25,000 toward public artwork at the development site. Prior to the
issuance of a Certificate of Occupancy for Phase II, the applicant shall
provide an additional $50,000 for public artwork.
- Phase III: The applicant shall
provide the $100,000 for public artwork prior to the issuance of a Zoning
Compliance Permit for Phase III.
- Irrigation:That the applicant incorporate several strategies for using rainwater and minimizing
the use of potable water. These strategies include:
- Collecting water
from rooftops in cisterns for use in irrigating ground level plant materials.
- Utilizing the
site’s retention ponds for irrigating ground level plant materials.
- Collecting water
from rooftops in cisterns for use in evaporative cooling Heat and Air
Conditioning systems, on buildings where these systems are used.
- Specifying
native plants, which are more acclimated to local wet and dry cycles, and
xerophytic landscaping in areas that are not intended to be wet. The applicant
proposes to use plants that thrive in wet conditions at the proposed water retention
basins, similar to plantings at the Exchange office complex.
- Restrictive
covenants established after October 1, 2008 shall specifically state that any requirements
for irrigation are suspended during declared periods of drought.
- Recreation
Space: That the applicant provide active recreation space to meet the Land
Use Management Ordinance requirements, with the option for payment-in-lieu,
subject to Town Manager approval.
- Water
Transmission Easement: That the applicant adjust the proposed water/sewer
lines to reserve a corridor for combined utilities, as proposed by OWASA.
- Per unit
Water Consumption Management: That the applicant provide a system and
management arrangement to ensure billing for water use by each dwelling unit
within the development. The system and arrangements must be approved by the
Town Manager prior to issuance of a Certificate of Occupancy, and must meet the
requirements of the Orange Water and Sewer Authority and North Carolina
Utilities Commission.
- Future
Water Pump Station: That the applicant reserve an easement in the northeast
corner of the site (Phase II) for a future water pump station.
- Parking Requirements: That future Special Use
Permit applications meet the Land Use Management Ordinance requirements subject
to Town Manager approval.
- Continued
Validity: The continued validity and effectiveness of this approval is
expressly conditioned on the continued compliance with the plans and conditions
listed above.
- Non-severability:That if any of the above conditions is held to be invalid.
This the 8th day of September, 2008.