A RESOLUTION APPROVING THE 2011-2017 CHAPEL HILL TRANSPORTATION PRIORITY LIST (2008-10-20/R-1)
WHEREAS, the Durham-Chapel Hill-Carrboro Transportation Advisory Committee has begun the process to develop the 2011-2017 Metropolitan Transportation Improvement Program; and
WHEREAS, the Transportation Advisory Committee will develop a Regional Transportation Priority List for use in developing the Metropolitan Transportation Improvement Program; and
WHEREAS, the Transportation Advisory Committee has requested local governments develop transportation priority lists for use in preparing the Regional Priority List; and
WHEREAS, the council received comments from the public on the 2011-2017 transportation priorities;
NOW, THEREFORE, BE IT RESOLVED, by the Council of the Town of Chapel Hill that the Council adopts the following list as the 2011-2017 Transportation Priority List for submission to the Transportation Advisory Committee:
1. |
Transit Capital Projects: (FY 2007-2011). |
2. |
Martin Luther King Jr. Boulevard/NC 86 Corridor: I-40 to North Street- Bicycle and pedestrian improvements. |
3. |
Bolin Creek Greenway: Construct a greenway from Martin Luther King Jr. Blvd. to Umstead Park. |
4. |
Homestead Road: NC 86 to High School Road, provide bicycle lanes, sidewalks and turn lanes |
5. |
Seawell School Road: Improvements from Homestead Road to Estes Drive Extension, including turn lanes, bicycle lanes, sidewalks and transit accommodations. |
6. |
Pedestrian and Bicycle Overpass/Underpass Across Fordham Boulevard: Construct a pedestrian and bicycle overpass or underpass across Fordham Boulevard in the area between Manning Drive and Old Mason Farm Road |
7. |
Townwide Intersection Improvements: Safety improvements for pedestrians and bicyclists in 15 locations, as identified in 2006 Townwide pedestrian safety evaluation, and NC54/South Columbia Street, NC54/Fordham Boulevard, and Merritt Mill Road/Brewer/Main.(combined NCinterections) |
8. |
Estes Drive Extension |
9. |
Cleland Drive/Burning Tree Drive: Construct sidewalks and pedestrian improvements along Cleland Drive and Burning Tree Drive. |
10. |
Pope Road: Construct sidewalks and five foot bicycle lanes. |
11. |
Ephesus Church Road: Construct sidewalks and five foot bicycle lanes. |
12. |
Fordham Boulevard: Construct sidewalk from Ephesus Church Road to Elliott Road |
13. |
Culbreth Road: Construct sidewalk from Adam Way to Smith Level Road |
14. |
Barbee Chapel Road: NC 54 to Downing Creek Parkway, provide sidewalks and bicycle lanes. |
15. |
Estes Drive: NC 86 to Curtis Road, widen existing roadway to include two 12-foot travel lanes, four-foot bicycle lanes and sidewalks. |
16. |
Mount Carmel Church Road: Improvements from US 15-501 South to Chatham County line, to be limited to include bicycle lanes, sidewalks, transit and safety improvements. |
17. |
Bolin Creek Phase IV, from Umstead Park to Carolina North; (formerly 14. Southern Railroad Greenway: Construct a greenway along the Southern Railroad right of way from Estes Drive to the UNC Horace Williams property.) |
18. |
Piney Mountain Road: Improvements from NC 86 to Riggsbee Road, including turn lanes, sidewalks, bicycle lanes and transit accommodations. |
19. |
Erwin Road: Construct bicycle lanes, sidewalks and safety improvements, US15-501 to Durham County line. |
20. |
Old Mason Farm/Finley Golf Course Road: Construct bicycle lanes and sidewalks. |
21. |
Morgan Creek Phase II |
22. |
Fordham Boulevard Corridor: US 15-501 South to Ephesus Church Road- bicycle and pedestrian Improvements. |
23. |
NC 54 Corridor: Fordham Boulevard to Barbee Chapel Road- bicycle and pedestrian Improvements. |
24. |
Horace Williams Trail, from Carolina North to the Town Operation Center |
25. |
Bolin Creek/Little Creek Greenway: Construct a greenway from Chapel Hill Community Center to Pinehurst Drive. |
|
|
Projects shown in bold type are new.
This the 20th day of October, 2008.