REVISED RESOLUTION A
(Approving the Special Use Permit Application)
A RESOLUTION APPROVING AN APPLICATION FOR SPECIAL USE
PERMIT FOR THE UNC INNOVATION CENTER (2009-01-26/R-10a)
BE IT RESOLVED by the
Council of the Town of Chapel Hill that it finds that the Special Use Permit application
proposed by the University of North Carolina at Chapel Hill, on property identified
as Orange County Parcel Identifier Number 9779-88-6375; if developed according
to the site plans dated April 30, 2008 would:
- Be located, designed, and proposed to be operated so as to maintain or
promote the public health, safety, and general welfare;
- Comply with all required regulations and standards of the Land Use
Management Ordinance;
- Be located, designed, and proposed to be operated so as to maintain or
enhance the value of contiguous property; and
- Conform with the general plans for the physical development of the Town
as embodied in the Land Use Management Ordinance and in the Comprehensive Plan.
BE IT FURTHER RESOLVED
that the Town Council hereby approves the application for a Special Use Permit
for the UNC Innovation Center for a building containing college/university use,
office-type business, research and limited supporting functions, in accordance
with the plans listed above and with the conditions listed below:
- Modification of Subsection 5.6.2
and 5.6.6 of the Land Use Management Ordinance, to allow landscaping which
does not meet the opacity standards of a Type “D” Landscape Buffer along
the Martin Luther King Jr. Boulevard frontage. This finding is based on
the determination that public purposes can be better achieved because the
applicant is proposing a landscape theme that is pedestrian, bicycle, and
transit-friendly, attempting to connect the building to proposed
sidewalks, bikeways, and transit stops.
- If the property encumbered by this Special Use Permit
subsequently becomes the subject of a Development Agreement and/or Master
Land Use Plan, then the terms of this Special Use Permit may be modified
or superseded by the terms of the Development Agreement and/or Master Land
Use Plan, if agreed upon by both parties.
General Stipulations for Development
- Construction Deadlines: That construction begin by January 26, 2011 and be
completed by January 26, 2013.
- Land Use Intensity:
|
Gross Land Area
|
7.98 acres
|
Total Maximum Floor
Area
|
80,745 square feet
|
Vehicle Parking Spaces
|
214
|
Maximum Impervious
Surface Area
|
164,325 square feet, unless
stormwater facilities are expanded or added
|
- Ad Valorem Taxation: That so long as the Innovation Center building
is privately owned, the building shall
be subject to ad valorem taxation per North Carolina General Statutes. In
addition, in the event the building reverts to public ownership and
subsequently is transferred back to private ownership, it shall again be
subject to ad valorem taxation for any periods in which it is held in private
ownership.
- Prohibition of Application for Tax-Exempt Status: That so long as the building is privately owned by a
for-profit entity, and that entity is, under future taxation law, considered to
be eligible to apply for tax-exempt status, the entity shall not apply for
tax-exempt status during this 40-50 year period. The University shall inform
the Town Manager and the Orange County Tax Assessor annually as to who owns the
building and whether the owner is tax exempt.
Transportation
- Closure of Existing Curb Cut and Closure of Public Access to Property
to the North: That the existing curb cut for Municipal Drive shall be
closed at the intersection with the new entrance drive and the immediate area
around the restored curb shall be landscaped to prevent access. The new
entrance drive shall not provide direct access to the existing asphalt and
gravel pavement on property adjacent to the north of the proposed Special Use
Permit boundary.
- New Access Drive: That the new access drive (relocated Municipal Drive)
shall be designed and built to Town standards, and to accommodate transit
service, with the understanding that initially the road will be owned and
maintained by the University, but may later be dedicated as a public roadway. The
final design of the roadway for this project shall be reviewed and approved by
the Town Manager and NCDOT prior to the issuance of a Zoning Compliance
Permit. The construction must be completed prior to occupancy of the building.
- Sidewalk Along Martin Luther King Jr. Boulevard: That prior to
occupancy of the building, a public sidewalk with a minimum width of 5 feet
shall be built along the west side of Martin Luther King Jr. Boulevard from
Estes Drive to the existing bus stop just north of the northern boundary of the
Innovation Center development. The location and design of the sidewalk shall
be consistent with the NC 86 Bicycle and Pedestrian Corridor Plan. The final
design of the sidewalk plans must be reviewed and approved by the Town Manager
and N.C. Department of Transportation prior to the issuance of a Zoning
Compliance Permit. The University shall be responsible for the perpetual
maintenance of the sidewalks. Public access shall be provided for sidewalk
sections that are not located in public right-of-way.
- Sidewalk Along the Entrance Drive: That prior to the
occupancy of the building, a sidewalk with minimum width of 5 feet shall be
built along the northern edge of the new drive (relocated Municipal Drive) from
Martin Luther King Jr. Boulevard to the western boundary of this
development. The final design of the sidewalk plans must be reviewed and
approved by the Town Manager and N.C. Department of Transportation prior to the
issuance of a Zoning Compliance Permit. The University shall be responsible
for the perpetual maintenance of the sidewalks. Public access shall be
provided for sidewalk sections that are not located in public right-of-way.
- Bike Lane and Curb and Gutter: That prior to occupancy of the
building , the applicant shall install a 5-foot bike lane and curb and gutter
along the University property frontage on western side of Martin Luther King
Jr. Boulevard, with the design approved by the Town Manager and NCDOT; or prior
to the issuance of a Zoning Compliance Permit, the applicant shall provide a
payment for the same, with the payment based on design consistent with the NC
86 Bicycle and Pedestrian Corridor Study Plan, with the design to be reviewed
and approved by the Town Manager and NCDOT.
- Pedestrian Refuge Island in Martin Luther King Jr. Boulevard: That
prior to the issuance of Zoning Compliance Permit, the applicant shall provide
a payment of $50,000 for construction of a pedestrian refuge island in Martin Luther
King Jr. Boulevard between Piney Mountain Road and Estes Drive.
- Street
and Sidewalk Lighting Plans: That prior to occupancy of the building, the
applicant shall design and install street lights along the property frontage on
west side of Martin Luther King Jr. Boulevard including the intersection of Piney
Mountain Road. Pedestrian lighting shall also be provided for the sidewalk at any
location where conditions warrant additional illumination for the pedestrians.
The design and construction must be reviewed and approved by the Town Manager,
N.C. Department of Transportation, and Duke Energy. The Town shalll be
responsible for the operating costs of the lights installed in the public
right-of-way.
- Traffic
Signal Improvements at Martin Luther King Jr. Boulevard and Piney Mountain Road
Intersection: That prior to occupancy of the building, the applicant shall
upgrade the existing traffic signals with:
- pedestrian amenities on all approaches of the intersection
including street imprint for all crosswalks, countdown heads, and audible
pedestrian signals;
- bicycle activated loops on side streets (Piney Mountain Road and
relocated Municipal Drive); and
- New traffic signals phasing as determined by the Town Manager and
N.C. Department of Transportation.
The design of the
improvements shall be reviewed and approved by the Town Manager and NCDOT prior
to the issuance of a Zoning Compliance Permit.
- Traffic
Signal Improvements at Martin Luther King Jr Boulevard and Estes Drive
Intersection: That prior to occupancy of the building, the applicant
upgrade the existing traffic signal with:
- pedestrian amenities on all approaches of the intersection including
street imprint for all crosswalks, countdown heads, and audible pedestrian
signals;
- bicycle activated loops on side streets (both legs of Estes Drive); and
- New traffic signals phasing as determined by the Town Manager and
N.C. Department of Transportation.
The design of the
improvements shall be reviewed and approved by the Town Manager and NCDOT prior
to the issuance of a Zoning Compliance Permit.
- Pedestrian
and Bicycle Path: That a pedestrian and bicycle path shall be provided
from the new parking lot to the bus stop on the west side of Martin Luther King
Jr. Boulevard, just south of the southern boundary of this Special Use Permit.
That the final design and location of this path shall be reviewed and approved
by the Town Manager prior to the issuance of a Zoning Compliance Permit.
- Right-of-Way
Dedication: That at such time as deemed appropriate by the Town Manager,
NCDOT and the Town Manager shall review and approve a plat for the purpose of
UNC’s dedication of public right-of-way along Martin Luther King Jr. Boulevard
with a width and location mutually agreed upon by the applicant, the Town, and
NCDOT. That the plat shall be recorded in the Orange County Register of Deeds
Office.
- North Carolina Department of Transportation Approvals: Plans for
improvements to State-maintained streets shall be approved by North Carolina
Department of Transportation prior to issuance of a Zoning Compliance Permit or
as authorized by a phasing plan approved by the Town Manager.
- Payment
for Martin Luther King Jr. Boulevard Signal Timing Improvements: That
prior to issuance of a Zoning Compliance Permit, the applicant shall make a
$7,000 payment to the Town for signal timing adjustments for signals along the
section of Martin Luther King Jr. Boulevard from Piney Mountain Road to Estes Drive.
- Pavement
Marking Plan: That the applicant shall submit a signage and pavement
marking plan to be approved by the Town Manager prior to issuance of a Zoning
Compliance Permit. The signs and pavement markings shall be installed by the
applicant prior to occupancy of the building. The pavement marking plan may be
amended in the future with authorization from the Town Manager.
- Bus Stop: That prior to occupancy of the building, the applicant shall make a
payment of $25,700 to the Town for improving bus stop(s) on Martin Luther King Jr. Boulevard
between Estes Drive and Timber Hollow Court.
- Transportation
Management Plan: A Transportation Management Plan shall be approved by the
Town Manager prior to issuance of a Zoning Compliance Permit. This plan shall
be updated and approved annually by the Town Manager. The required components
of the Transportation Management Plan shall include:
- Provision for designation of a Transportation Coordinator;
- Provisions for an annual Transportation Survey and Annual Report
to the Town Manager;
- Quantifiable traffic reduction goals and objectives;
- Ridesharing incentives;
- Public transit incentives; and
- Other measures subject to approval by the Town Manager.
- Lockers and showers shall be provided in the new building.
Parking
- Bicycle
Parking Spaces: That the applicant proved a minimum of 22 bicycle parking
spaces and that the spaces comply with Class I and Class II town standards.
However, if the Council adopts a text amendment creating bicycle parking
standards for university use prior to approving this Special Use Permit
application, the new bicycle parking standards shall apply.
- Parking Lot: That the parking lot, for 214 vehicular spaces, be constructed to
Town standards for pavement and design.
Landscaping and Architecture
- Parking Lot Landscaping: That the applicant will provide a detailed landscaping
plan which includes the following features:
- a 5-foot wide planting strip between building and adjacent
surface parking areas;
- a 3-foot high screening device between ground-level parking and
adjacent streets; and
- a minimum of 35% vegetative shading in surface parking areas.
- Building
Elevations and Lighting Plan: That detailed building elevations and a
lighting plan, including proposed energy efficient and light cutoff features be
submitted for Community Design Commission approval, prior to the issuance of a
Zoning Compliance Permit, for: 1) building elevations, including the location
and screening of all HVAC/Air Handling Units, and 2) a lighting plan to ensure
that the proposed lighting plan will minimize A) upward light pollution and B)
offsite spillage of light.
Environment
- Stormwater
Management Plan: That prior to the issuance of a Zoning Compliance Permit,
the applicant shall submit a Stormwater Management Plan for review and approval
by the Town Manager. The plan shall include the use of porous pavement. The
plan shall be based on the 1-year, 2-year, and 25-year frequency, 24-hour
duration storms, where the post-development stormwater run-off rate shall not
exceed the pre-development rate and the post-development stormwater runoff
volume shall not exceed the pre-development volume for the local 2-year
frequency, 24-hour duration storm event. Engineered stormwater facilities shall
also remove 85% total suspended solids and treat the first inch of
precipitation utilizing North Carolina Division of Water Quality design
standards.
The stormwater
management plan shall show how stormwater runoff will be conveyed to the
proposed stormwater management facilities and then discharged further along the
proposed integrated “treatment train” system; and show the points of off-site
discharge from the management facilities.
- Stormwater
Facility Prohibited in the Public Right-of-Way: That all stormwater structures
and associated infrastructure shall be located outside of existing or proposed
rights-of-way as well as outside of all building setbacks.
- Storm
Drainage Way That all stormwater management structures outside the public
right-of-way shall be located inside reserved storm drainageways and shown on
the final plans and final plat, per Town guidelines.
- Stormwater
Operations and Maintenance Plan: That the applicant shall provide a
Stormwater Operations and Maintenance Plan for all engineered stormwater
facilities. The plan shall include the owner's financial responsibility and
include the maintenance schedule of the facilities to ensure that it continues
to function as originally intended and shall be approved by the Town Manager,
prior to the issuance of a Zoning Compliance Permit.
- Wetlands
Identification and Permitting: That any regulatory wetlands be
identified and necessary state and federal permits obtained prior to issuance
of a Zoning Compliance Permit.
- State
or Federal Approvals: That any required state or federal permits or
encroachment agreements must be approved by the appropriate agencies and copies
of the approved permits be submitted to the Town Manager prior to the issuance
of a Zoning Compliance Permit.
- Erosion
Control: That a detailed soil erosion and sedimentation control plan for
the site and the off-site utility work, including provision for monitoring and
maintenance of facilities and modifications of the plan if necessary, be
approved by the State Department of Environment, Health and Natural Resources,
or appropriate successor agency, and a copy of the approval be submitted to the
Town Manager prior to issuance of a Zoning Compliance Permit.
- Silt
Control: That the applicant takes appropriate measures to prevent and
remove the deposit of wet or dry silt on adjacent paved roadways.
- Energy
Management PlanThat an Energy Management Plan shall be approved by
the Town Manager prior to issuance of a Zoning Compliance Permit. Final Plans
incorporate a “20 percent more energy efficient” feature relative to the energy
efficiency standard of the American Society of Heating, Refrigeration, and Air
Conditioning Engineers (ASHRAE), as amended and in effect at the time of
building permit issuance. Comparable standards generally recognized as
applicable to building energy consumption, as amended and in effect at the time
of building permit issuance, may be used by the applicant when incorporating
the “20 percent more energy efficient” feature into the final plans. Building
tenants shall be provided with energy-saving design and construction guidelines
for tenant education and possible implementation.
- Leadership in Energy and Environmental Design (LEED) Technologies:
- That the applicant shall submit evidence (U.S. Green Building Council
certificate) that at least one member of each of the following is a LEED
accredited professional: developer, architect, mechanical/electrical/plumbing
engineer.
- That the applicant shall provide evidence that the project is registered
with the USGBC LEED-CSv2.0 program and is applying for LEED certification. The
applicant shall provide evidence of engagement with a third party LEED
consultant.
- That the applicant shall provide evidence that the building will be
commissioned following the Enhanced Commissioning requirements of LEED-CSv2.0
Energy and Atmosphere Credit 3.
- That the applicant shall develop a Green Technology Probability Matrix
for the green technological elements anticipated to earn credit points under
LEED certification.
- That the applicant shall provide evidence that the technologies proposed
in the UNC Innovation Center Green Technology Matrix with an implementation
probability of 90% or greater are included in the USGBC LEED – CSv2.0
application, or provide an acceptable explanation of any changes to the matrix.
- That the applicant shall implement other items from the UNC Innovation
Center Green Technology Matrix , with lesser implementation probabilities as
practicable.
- That the applicant shall provide the documentation necessary to demonstrate
that an application has been filed with the USGBC for LEED – CSv2.0 with a
minimum of 28 LEED points applied for.
- Upon determination that the UNC Innovation center has received third
party verification of LEED – CSv2.0 Silver Certification, the applicant shall
submit all appropriate and necessary documentation demonstrating this fact to
the Town Planning Department and Office of Sustainability.
Utility and Services
- Solid
Waste Management Preconstruction Conference: Solid waste collection shall
be provided by the university. The applicant shall consider including Orange
County Solid Waste in the pre-construction conference.
- Utility
Plan Approval: That the final Utility Plan shall be reviewed by, and where
applicable approved by, Duke Energy or Progress Energy, OWASA, AT&T, Public
Service Company, Time Warner Cable, and the Town Manager prior to issuance of a
Zoning Compliance Permit.
- Utility
Line Placement: That except for three phase electrical distribution line,
all new and relocated utility lines shall be placed underground. The applicant
shall indicate proposed off-site utility line routing and upgrades required to
service the site on Final Plans, to be approved by the Town Manager prior to
issuance of a Zoning Compliance Permit.
Fire Protection
- Fire
Prevention Program: During demolition and/or construction, all aspects of
Chapter 14 of the NC Fire Prevention Code shall be followed. The
owner/developer shall designate one person to be the Fire Prevention Program
Superintendent who shall be responsible for enforcing Chapter 14 of the NCFPC
and the on-site fire prevention program and ensure that it is carried out
through completion of the project.
- Fire
Hydrant and FDC Locations: The locations of existing and proposed fire
hydrants and Fire Department Connections (FDC) shall be shown on the final
plans. Fire Department Connections should be located on the street side
of the building within 150 feet of a hydrant. Hydrant spacing shall
comply with the Town Design Manual.
- Timing
of Fire Protection Infrastructure: The following note shall be included on
final plans: “When fire apparatus access roads or a water supply for fire
protection is required to be installed, such protection shall be
installed and made serviceable prior to and during the time of
construction, except when approved alternate means of fire protection are
provided.
- Fire
Department Access: The following note shall be added to final plans: “Any
and all roads, driveways or dedicated fire lanes used for fire department access
shall be all-weather and designed to support to carry the imposed load of fire
apparatus weighing 75,000 lbs. Fire access roads shall have a minimum width of
20 feet with overhead clearance of 13 feet, 6 inches.”
Prior to
issuance of a Zoning Compliance Permit, radii of all turns, bridges, and
depressions within roadways shall be designed and constructed to be accessible
by the largest fire apparatus operated by the Town of Chapel Hill.
Prior to
issuance of a Zoning Compliance Permit, final plans shall include details for
signage, bollards, and/or pavement markings used to prevent parking that would
hinder fire apparatus access.
- Fire
Flow Report: Prior to the issuance of a Zoning Compliance Permit, the
applicant shall submit two copies of the fire flow report, sealed by an
Engineer registered in the State of North Carolina, for approval by the Town
Manager. Fire flow shall meet the required flow set forth in the Town Design
Manual.
- Testing
of Fire Protection Devices: Prior to occupancy of the building, fire
protection devices shall be required to be installed, tested, approved, and
permitted by the Fire Marshal, where required by the NC Fire Prevention Code,
Town of Chapel Hill Code (Chapter 5), and applicable NFPA codes.
- Notification of
Fire Hazards: That the UNC Department of Environment, Health, and Safety
will be responsible for monitoring hazardous materials and developing a safety
plan for the development; and shall report pertinent fire safety information to
the Chapel Hill Fire Department on a regular basis, in accordance with current
reporting policy for campus buildings.
Miscellaneous Stipulations
- Construction
Management Plan: That a Construction Management Plan be approved by the
Town Manager prior to issuance of a Zoning Compliance Permit. That the
construction management plan: 1) indicate how construction vehicle traffic will
be managed, 2) identify parking areas for on-site construction workers
including plans to prohibit parking in residential neighborhoods, 3) indicate
construction staging and material storage areas, and 4) identify construction
trailers and other associated temporary construction management structures.
- Traffic
and Pedestrian Control Plan: That a Traffic and Pedestrian Control Plan be
reviewed and approved by the Town Manager prior to the issuance of a Zoning
Compliance Permit. That the plans include a Work Zone Traffic Control Plan for
movement of motorized and non-motorized vehicles on any public street that will
be disrupted during construction. The plan must include a pedestrian management
plan indicating how pedestrian movements will be safely maintained. At
least 5 working days prior to any proposed lane or street closure the applicant
must apply to the Town Manager for a lane or street closure permit.
- Open
Burning: That the open burning of trees, limbs, stumps and construction
debris association with this development is prohibited.
- FAA
Compliance: That prior to the issuance of a Zoning Compliance Permit, the
applicant shall provide a letter from the FAA verifying that this development
is not subject to FAA restrictions, or that all necessary FAA-related permits
be obtained.
- Detailed
Plans: That final detailed site plans, grading plans, utility/lighting
plans, stormwater management plans (with hydrologic calculations), and
landscape plans and landscape maintenance plans be approved by the Town Manager
prior to issuance of a Zoning Compliance Permit, and that such plans conform to
the plans approved by this application and demonstrate compliance with all applicable
conditions and the design standards of the Land Use Management Ordinance and
the Design Manual.
- As-Built Plans: That certified
as-built plans, signed and sealed by a North Carolina-registered Professional
Land Surveyor, showing building footprints, driveways, stormwater
drainage/conveyance piping, stormwater management structures, and all other
impervious surfaces shall be provided for street improvements and all
other existing or proposed impervious surfaces prior to occupancy of the
building. The as-built plans shall be in DXF binary
format using State plane coordinates and NAVD 88.
- New
Streets - Traffic Signs: That the property owners shall be responsible for
placement and maintenance of temporary regulatory signs, including street name
signs, before occupancy of the building, until such time that the street
system is accepted for maintenance by the Town.
- New
Street Names and Numbers: That the name of the development and its streets
and building numbers shall be coordinated between the University, Town, Orange
County, and Emergency Management, prior to issuance of a Zoning Compliance
Permit.
- Construction
Sign: That the applicant shall post a construction sign at the development
site that lists the property owner’s representative and telephone number, the
contractor’s representative and telephone number, and a telephone number for
regulatory information at the time of issuance of a Building Permit, prior to
the commencement of any land disturbing activities. The construction sign may
have a maximum of 16 square feet of display area and may not exceed 6 feet in
height. The sign shall be non-illuminated, and shall consist of light letters
on a dark background. That a detail of the sign shall be reviewed and approved
by the Town Manager prior to the issuance of a Zoning Compliance Permit.
- Vested
Rights: This Special Use Permit constitutes a site specific
development plan establishing a vested rights as provided by N.C.G.S.
Sec. 160A-185.1 and Appendix A of the Chapel Hill Land Use Management Ordinance.
- Continued Validity: That continued validity and effectiveness of this approval is
expressly conditioned on the continued compliance with the plans and conditions
listed above.
- Non-severability:That if any of the above conditions is held to be invalid, approval in its
entirety shall be void.
BE IT FURTHER RESOLVED
that the Council hereby approves the Special Use Permit for the UNC Innovation Center.
This the 26th day of January,
2009.