OPTION 4 - South side of East Franklin Street from McCorkle Place to the Chapel of the Cross

 

This section of proposed improvements extends from the eastern end of the 2003 Streetscape project on the south side of the intersection with Henderson Street 890 feet to the east within the portion of the Streetscape Master Plan described as the “University District.” It includes improvements consistent with those requested in the attached recent petition to the Council from members of the Chapel of the Cross.  With the exception of Chapel of the Cross, adjacent uses are related to the University of North Carolina campus including McCorkle Place and Morehead Planetarium. There are 21 parking spaces and a bus stop at the curb on Franklin Street.  Four driveways that serve the planetarium and the church cross the sidewalk in this section. The existing brick sidewalk is only in fair condition due to broken or missing bricks and several places that have been pushed up by the roots of large mature street trees.

 

Because this portion of Franklin Street was not proposed for lighting improvements as shown on the Downtown Streetscape Lighting Plan, it will not be necessary to install the underground utility ductbank beneath the sidewalk. In previous Streetscape projects, a large portion of the resources (budget, equipment, materials, man-hours) was typically required for the ductbank. Without that portion of the infrastructure, a longer section of sidewalk can be improved with a comparable budget. Proposed improvements include replacing the existing concrete curb and gutter and the brick sidewalk, using concrete walkways at driveway crossings. Short sections of new brick sidewalk will be added to provide connections for pedestrians parked on Franklin Street. Bollards connected by chain similar to those specified in 2003 will be used between the new walkways to eliminate pedestrian traffic over the root zones of the large street trees and to protect the groundcover plantings.

 

A 3-foot brick strip behind the curb will be installed in front of Chapel of the Cross consistent with the University’s frontage. Typical Streetscape furnishings and three additional street trees are proposed. As recommended in the Streetscape Master Plan, a bench grouping is proposed at the cross walk near the mid-block between the Planetarium and the church.

 

Public Works staff will work cooperatively with UNC’s Grounds Superintendent and crews to use pressurized air as the method for tilling mulched areas to replace groundcover and minimize disturbance to tree roots. We will also work with the Public Arts Commission to determine if one percent of the project budget can be used to incorporate art or if the funds should be pooled with last year’s Streetscape allocation for a future public art project.

 

The approximate cost of Option 4 is $100,000.

 

Advantages of Option 4

 

  • Improves sidewalk and curb and gutter sections in fair to poor condition
  • Can complete a longer section of sidewalk without ductbank installation
  • Relatively few adjacent property owners simplify construction logistics
  • Provides additional protection (bollards and chains) for some of the Town’s largest mature street trees

 

Disadvantages of Option 4

 

  • The location of the project at the periphery of the Downtown Streetscape Master Plan Study Area may make the project appear to be less of an improvement to the Downtown than other options presented
  • Does not advance downtown lighting improvements
  • As primarily a maintenance and repair project, may have somewhat less visual effect when completed than other Streetscape projects that typically include more substantial design improvements

 


OPTION 4