SUMMARY
OF COMMUNITY DESIGN COMMISSION ACTION
Subject:
Meeting
Date: March 17, 2004
Recommendation: That
the Council approve the Special Use Permit for the Olin T.
1.
Construction
Completion Date (stipulation #1): Since the applicant anticipates a long build out schedule, change
construction completion date from three years to ten years after approval date.
2. Elimination of Curb-Cut and
3. New Curb-Cut on
4. Elimination of the Curb-Cut and Driveway near University Mall Driveway (stipulation #7): Permit greater flexibility
to the applicant’s construction timetable by stipulating that installation of
new curb, gutter and sidewalk near the University Mall Driveway shall occur
within 6 months after the reconstructed Mall driveway is completed or within
2 years of Council approval date, whichever occurs later.
5. Stormwater Management Plan (stipulation #22): Permit construction of the proposed rain gardens
within the Significant Tree Stand area by replace the last sentence in the
first paragraph with the following statement: That except for land disturbance associated with the installation of
the proposed rain gardens, as shown by Attachment #16, land disturbance
associated with stormwater management, within the
Significant Tree Stand area approved on the Final Plans, shall be prohibited.
Vote: 10-0
Aye:
George Cianciolo, Dale Coker, Chris Culbreth,
Thatcher Freund, Laura King Moore, Charlotte Newby, Glenn Parks, Scott Radway, Amy Ryan, Polly Van de Velde.
Nay: None
Prepared by: Charlotte Newby, Chair
Gene
Poveromo, Staff