TOWN OF CHAPEL HILL SCHEDULE OF PERMIT FEES-Effective July 1, 2005

BUILDING FEES

 

 

 

NOTICES:

 

 

 Cost of Construction

Fee

1.

2.

4.

$100 - $1,000

$28.00

Determination of Total Valuation

Additional inspections made

Building permits proposed to be

$1,001 - $5,000

$45.00

For purposes of determining fees, total valuation shall be either the

necessary through failure to

comply with applicable code

assisted through conventional

Public Housing, Section 8, 101,

$5,001 - $10,000

$61.00

actual contract price or an applicable

requirements shall be hereby

235, CDBG funding as well as

$10,001 - $20,000

$84.00

amount based on the total square

designated as “Re-inspections”.

through the NC Housing Finance

$20,001 - $50,000

$7.00 per thousand

footage of the structure to be built,

For each extra trip, a fee of $50

and other recognized forms of

$50,001 - $500,000

Base fee of $350 + $2.53/$1,000 over $50,001

multiplied by the square foot cost

will be charged.

subsidy, are exempted. In pro-

$500,001 and up

Base fee of $1,489 + $1.35/$1,000 over $500,001

data prescribed on the attached  

 

jects where assisted units com-

Swimming Pools

$45.00 In Town limits/$67.00 Out

Building Valuation Data Table, which

Is part of this fee schedule, which-

 

prise only a portion of the total

number of units, the fee is re-

Signs

$28.00 + $11.00 each additional sign

ever is greater.

3.Impact Fees:

 

duced by the percentage of the total number that are assisted.

Mobile Homes/Trailers

$45.00 In Town limits/ $67.00 Out

GENERAL CONTRACTOR

$4,407- Detached single family

Fees are waived for Town of

Insulation

$45.00 In Town limits/$56.00 Out (each unit)

PAYS ALL PERMIT FEES.

$1,979- Attached dwelling unit

Chapel Hill permits.

 

 

 

 

 

ELECTRICAL FEES

 

                                

PLUMBING FEES

 

Work Commencing Before Permit Issuance:

For Outside Town limits add

$30.00 to charges below

Inside Town limits

Outside Town limits

 

Single Meter - 100 amp

$56.00

$7.00 per fixture

$8.00 per fixture

If any person commences any

Single Meter - 125 amp

$61.00

$34.00 minimum charge

$39.00 minimum charge

work on a building or service

Single Meter - 150 amp

$67.00

Sewer connection - $34.00

Sewer connection - $39.00

system before obtaining the

Single Meter - 200 amp

$72.00

 

 

necessary permit, he or she shall

Single Meter - 400 amp

$78.00

MECHANICAL FEES

 

 

be subject to a double permit fee.

Single Meter - 600 amp

$89.00

Type of Heating/Cooling

Fee

Rental Licensing Fee

Single Meter - 800 amp

$100.00

Electric Furnace

$28.00 In Town limits/ $56.00 Out

The rental licensing fee is $10.00

Single Meter - 1000 amp

$112.00

Gas Furnace

$28.00 In Town limits/ $56.00 Out

For each unit. The license fee is

Additions/Alterations(counted

by # of boxes added/moved)

First 10 - $34.00

Each additional 10 - $3.50

Heat Pump

Gas Pack

$56.00 In Town limits/ $110.00 Out

doubled when applied for after

Change Service

$28.00 In Town/$45.00 Out

Chiller

$28.00 In Town limits/ $56.00 Out

the deadline

Mobile Homes/Trailers

$28.00 In Town/$45.00 Out

Air Conditioning

$28.00 In Town limits/ $56.00 Out

 

 

                                                                                                                                                                                                            April 25, 2005