A
RESOLUTION APPROVING AN APPLICATION FOR A SPECIAL USE PERMIT FOR THE OWASA PUMP
STATION (2005-06-15/R-19a)
NOW,
THEREFORE, BE IT RESOLVED by the Council of the Town of Chapel Hill that it
finds that the Special Use Permit application proposed by Philip Post of Philip
Post & Associates for the OWASA Pump Station on property identified as
Durham County Tax Map 478, Block 1, Lot 6 (PIN 070901191301) if developed
according to the site plans dated October 1, 2004, revised March 11, 2005, and
the conditions listed below:
1.
Would be located, designed, and
proposed to be operated so as to maintain or promote the public health, safety,
and general welfare;
2.
Would comply with all required
regulations and standards of the Land Use Management Ordinance;
3.
Would continue a use and
development that constitutes a public necessity; and
4.
Would conform with the general
plans for the physical development of the Town as embodied in the Land Use
Management Ordinance and in the Comprehensive Plan.
BE
IT FURTHER RESOLVED that the Town Council hereby approves the application for a
Special Use Permit for the OWASA Pump Station in accordance with the plans
listed above and with the conditions listed below:
Stipulations Specific to the Development
- That construction begin by June 15, 2007 (two
years from approval date) and be completed by June 15, 2008 (three years
from approval date).
Stipulations Related to Transportation
Issues
- Ingress/Egress
Access Easement: That the Town Manager approve an access easement for ingress and egress to the site from Old Chapel Hill Road,
to be recorded prior to the issuance of a Zoning Compliance Permit.
- Traffic
and Pedestrian Control Plan:
That a Traffic Management Plan for movement of motorized and non-motorized
vehicles on any public street that will be disrupted during construction,
including detour information and a pedestrian management plan indicating
how pedestrian movements will be safely maintained shall be reviewed and
approved by the Town Manager prior to the issuance of a Zoning Compliance
Permit.
- Gravel
Walkway: That the gravel area
along the frontage of the site be maintained as a pedestrian walkway until
such time as a more permanent sidewalk is installed; Final Plans subject
to review and approved by the Town Manager.
Stipulations Related to Landscaping and Architectural
Issues
- Required
Buffers: That the following
landscape buffers be provided, and if any existing vegetation is to be
used to satisfy the buffer requirements, the vegetation will be protected
by fencing from adjacent construction:
Required Landscape Buffers
Location
|
Required Buffers
|
Southern Property Line
(Old Chapel Hill Road frontage)
|
20 ft. Type ‘C’ Buffer
|
Eastern Property Line
(Interstate 40 frontage)
|
100 ft. Type ‘E’ Buffer
|
- Landscape
Protection Plan: That a detailed
Landscape Protection Plan, clearly indicating significant tree stands,
detail of protective fencing and construction parking and materials
staging/storage areas, and including Town standard landscaping protection
notes, shall be approved by the Town Manager prior to issuance of a Zoning
Compliance Permit.
- Parking
Lot Landscape Screening: That
all parking areas shall be screened from view in accordance with the
provisions of Article 5.6 of the Land Use Management Ordinance. The
landscape screening plans shall be approved by the Town Manager prior to the issuance of a Zoning Compliance Permit.
- Landscape
Plan and Landscape Maintenance Plan:
That a detailed Landscape Plan including a Landscape Maintenance Plan,
shall be approved by the Town Manager prior to issuance of a Zoning
Compliance Permit. The landscape plan shall indicate
the size, type, and location of all proposed plantings as well as the
limits of land disturbance and tree protection fencing.
- Building
Elevations: That the Community
Design Commission approve building elevations for this project, prior to
issuance of a Zoning Compliance Permit. The height of the building shall
meet the 29’ ordinance requirement.
- Lighting
Plan: That the Community Design
Commission approve a lighting plan for this project prior to issuance of a
Zoning Compliance Permit. The Community Design Commission shall take
additional care during review to ensure that the proposed lighting plan
will minimize 1) upward light pollution and 2) offsite spillage of light.
Stipulations Related to Environmental Issues
- Stormwater
Management Plan: That prior to
the issuance of a Zoning Compliance Permit the applicant shall submit a
Stormwater Management Plan for review and approval by the Town Manager. The plan shall include low-impact stormwater management solutions and best management
practices, such as bio-retention, pervious pavements, underground storage,
infiltration trenches, vegetative swales and similar techniques.
The plan shall be based on the 1-year, 2-year, and
25-year frequency, 24-hour duration storms, where the post-development
stormwater run-off rate shall not exceed the pre-development rate and the
post-development stormwater runoff volume shall not exceed the pre-development
volume for the local 2-year frequency, 24-hour duration storm event. Engineered
stormwater facilities shall also remove 85% total suspended solids and treat
the first inch of precipitation utilizing NC Division of Water Quality design
standards.
- Storm
Drainageway Easement: That all
stormwater management improvements, outside public right-of-way, shall be
located inside reserved storm drainageway easements, per Town guidelines,
to be approved by the Town Manager prior to the issuance of a Zoning
Compliance Permit.
- Stormwater
Operations and Maintenance Plan:
That the applicant shall provide a Stormwater Operations and Maintenance
Plan for all engineered stormwater facilities. We recommend that the plan
include the owner's financial responsibility and include the maintenance
schedule of the facilities to ensure that it continues to function as
originally intended and shall be approved by the Town Manager, prior to the issuance of a Zoning Compliance Permit.
- State
or Federal Approvals: That any
required State or Federal permits or encroachment agreements must be
approved by the appropriate agencies and copies of the approved permits be
submitted to the Town Manager prior to the issuance of a Zoning Compliance
Permit.
- Erosion
Control: That a detailed soil
erosion and sedimentation control plan, including provision for monitoring
and maintenance of facilities and modifications of the plan if necessary,
be approved by the County Erosion Control Officer and the Town Manager prior to issuance of a Zoning Compliance Permit. That a performance guarantee shall be
provided, if more than one acre of land is disturbed, in accordance with
Section 5-97.1 of the Town Code of Ordinances prior to issuance of any
permit to begin land-disturbing activity.
- Silt
Control: That the applicant
takes appropriate measures to prevent and remove the deposit of wet or dry
silt on adjacent paved roadways.
Stipulations Related to Utility and Service Issues
- Solid
Waste Management Plan: That a
Solid Waste Management Plan, including provisions for recycling, and for
managing and minimizing construction debris, shall be approved by the Town
Manager prior to issuance of a Zoning Compliance Permit.
- Overhead Obstruction/Utility Lines: That the final plans included
details verifying that no overhead obstruction or utility wires will interfere
with service vehicle access or operation.
- Utility
Plan Approval: That the final
Utility Plan be approved by Duke Power Company, Orange Water and Sewer
Authority, BellSouth, and the Town Manager prior to issuance of a Zoning
Compliance Permit.
- Utility
Line Placement: That all new
utility lines shall be placed underground. The applicant shall indicate
proposed off-site utility line routing and upgrades required to service
the site on Final Plans, to be approved by the Town Manager prior to
issuance of a Zoning Compliance Permit.
- Landscape
Encroachment Agreements: The
applicant will need to obtain encroachment agreements from Duke Power
Company and from NCDOT, for the portions of landscaping proposed within
the utility easement and right-of-way.
- Fire
Flow: That a fire flow report
for all new construction, shall be prepared and sealed by a registered
professional engineer, which demonstrates that flows meet the minimum
requirements of the Town Design Manual, to be approved by the Town Manager prior to issuance of a Zoning Compliance Permit.
Stipulations Related
to Miscellaneous Issues
- Construction
Management Plan: That a Construction Management Plan, indicating
how construction vehicle traffic will be managed, shall be approved by the
Town Manager prior to the issuance of a Zoning Compliance Permit.
- Open
Burning: That the open burning
of trees, limbs, stumps and construction debris association with this
development is prohibited.
- Detailed
Plans: That final detailed site
plans, grading plans, utility/lighting plans, stormwater management plans
(with hydrologic calculations), and landscape plans and landscape
maintenance plans be approved by the Town Manager prior to issuance of a
Zoning Compliance Permit, and that such plans conform to the plans approved
by this application and demonstrate compliance with all applicable
conditions and the design standards of the Land Use Management Ordinance
and the Design Manual.
- As-Built
Plans: That as-built plans in
DXF binary format using State plane coordinates, shall be provided for
street improvements and all other existing or proposed impervious surfaces
prior to issuance of the Certificate of Occupancy.
- Construction
Sign: That the applicant shall
post a construction sign that lists the property owner’s representative
and telephone number, the contractor’s representative and telephone
number, and a telephone number for regulatory information at the time of
issuance of a Building Permit, prior to the commencement of any land
disturbing activities. The construction sign may have a maximum of 16
square feet of display area and may not exceed 6 feet in height. The sign
shall be non-illuminated, and shall consist of light letters on a dark
background.
- Continued
Validity: That continued
validity and effectiveness of this approval is expressly conditioned on
the continued compliance with the plans and conditions listed above.
- Non-severability: That if any of the above conditions is held to
be invalid, approval in its entirety shall be void.
BE
IT FURTHER RESOLVED by the Council of the Town of Chapel Hill that the Council
hereby approves the application for the Special Use Permit application for
OWASA I-40 Pump Station in accordance with the plans and conditions listed
above.
This
is the 15th day of June, 2005.